
en07000142.vsd
External
Equipment (PC)
PE 1) 3)
2)
IED
1
6
5
4
3
2
X1
PE
PE
Cc
PE
IED
X1
1
6
5
4
3
2
1)
1)
Cc
IEC07000142 V1 EN
Figure 37:
Communication cable installation, 4-wire
Where:
1
The inner shields shall be connected together (with an isolated terminal block) and only
have one earthing point in the whole system, preferably at the external equipment (PC).
The outer shield shall be connected to Protective Earth (PE) in every cable end that is, to PE
at all IED terminals and to PE at External equipment (PC). The first IED will have only one
cable end but all others of course two.
2
Connect according to installation instructions for the actual equipment, observe the 120
ohms termination.
3
The protective earth should be close to the external equipment (< 2m)
Cc
Communication cable
PE
Protective earthscrew
1MRK 504 088-UEN C
Section 5
Installing the IED
67
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...