Section 3
Overview
About this chapter
This chapter outlines the installation and commissioning of the IED.
3.1
Commissioning and installation overview
The settings for each function must be calculated before the commissioning task
can start. A configuration, done in the configuration and programming tool, must
also be available if the IED does not have a factory configuration downloaded.
The IED is unpacked and visually checked. It is preferably mounted in a cubicle or
on a wall. The connection to the protection system has to be checked in order to
verify that the installation is successful.
1MRK 504 088-UEN C
Section 3
Overview
19
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...