Refitting the serial measurement unit
Use this procedure refit the serial measurement unit.
Note
Action
xx0500001392
A Pins
Fit the serial measurement unit on to the four
pins.
1
Make sure the unit is positioned as
straight as possible! The push buttons
can otherwise get jammed.
Slide the unit into position, within the lips,
and secure with the four hexagon nuts.
2
Shown in the figure
.
Reconnect all the
connectors
.
Make sure the lock on the battery cable con-
nector R2.G snaps into place during refitting.
3
xx0600002777
Refit the centering piece (B) to the push but-
ton unit in order to align it vertically.
Also make sure that the unit is correctly
aligned sideways: the measurements x1 and
x2 in the figure to the right should not differ
more than 1 mm from each other!
4
Art. no. for the centering piece is specified
in
Required equipment on page 246
Spare part no. is specified in
.
Check the
gasket
of the base cover. Replace
it if damaged.
5
Shown in the figure
Refit the
base cover
.
6
WARNING
Before continuing any service work, follow
the safety procedure in section
release buttons may be jammed after service
work on page 161
7
Refit the push button guard to the robot base.
8
Continues on next page
Product manual - IRB 1600/1660
249
3HAC026660-001 Revision: W
© Copyright 2006-2018 ABB. All rights reserved.
4 Repair
4.5.2 Replacing the serial measurement unit
Continued
Summary of Contents for IRB 1660
Page 1: ...ROBOTICS Product manual IRB 1600 1660 ...
Page 8: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 48: ...This page is intentionally left blank ...
Page 152: ...This page is intentionally left blank ...
Page 336: ...This page is intentionally left blank ...
Page 372: ...This page is intentionally left blank ...
Page 388: ...This page is intentionally left blank ...
Page 396: ......
Page 397: ......