Refitting, complete arm system
The procedure below details how to refit the complete arm system to the robot.
Note/Illustration
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot working area.
1
Clean the mating surfaces on both the lower arm
and on the frame with isopropanol. Also clean the
area where the sealing ring is fitted, if it has been
removed.
2
Art. no. is specified in
.
xx0400001245
Fit the
sealing ring
properly to the frame. Replace
it if damaged.
3
•
A: Sealing ring
•
B: Mating surface
Lubricate the attachment holes at the mating surface
on the frame with Loctite 574.
4
CAUTION
The complete arm system weighs 55 kg.
All lifting accessories used must be sized accord-
ingly!
5
Fit the lifting slings to the complete arm system and
lift it into position while inserting the cabling into the
frame.
6
12 pcs; M10 x 40, tightening
torque: 70 Nm.
Fit the lower arm against the frame, fit the one
washer and secure with the 12 attachment screws.
7
Detailed in section
cable harness in frame and base
on page 170
Refit the cabling inside the frame and the base.
8
Art. no. is specified in
.
Fit a new
VK-cover
to the lower arm.
9
Continues on next page
Product manual - IRB 1600/1660
181
3HAC026660-001 Revision: W
© Copyright 2006-2018 ABB. All rights reserved.
4 Repair
4.3.3 Replacement of complete arm system
Continued
Summary of Contents for IRB 1660
Page 1: ...ROBOTICS Product manual IRB 1600 1660 ...
Page 8: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 48: ...This page is intentionally left blank ...
Page 152: ...This page is intentionally left blank ...
Page 336: ...This page is intentionally left blank ...
Page 372: ...This page is intentionally left blank ...
Page 388: ...This page is intentionally left blank ...
Page 396: ......
Page 397: ......