
ABB Switzerland Ltd
1KHW001495-EN
Archive No.:
Rev.
Date:
Commissioning Instructions ETL600 Rel.1
- A
05-11-16
Responsible Department:
Prepared:
Approved:
Distribution:
Lang.:
Page:
PTUKT
2005-09-13 H. Benninger
2005-11-16 C. Leeb
-
EN
1/28
Valid for:
Derived from:
Replaces:
Classification-No.:
File:
- 1KHL015944-EN
-
-
1KHW001495ae
Commissioning
Instructions ETL600 Rel1.doc
Powerline Carrier Equipment: Series ETL600
Commissioning Instructions ETL600 Rel.1
This document describes programming and testing of powerline carrier equipment ETL640 and ETL680,
including the teleprotection system NSD600.
Contents
Commissioning Instructions for the ETL600 Rel.1 Equipment
Power supply for channel rack P7LA
Connect to equipment, upload configuration
Change configuration, if necessary
Configure Real Time Clock (RTC)
Testing of NSD600 with interface G4AI, if present
Sheet ETL600 System Test report ....................................................................... C1 - C10
Test conditions:
•
Temperature range: 10 °C to 40 °C.
•
The connections for the tests can be made either at the test sockets on the front of the
equipment or at the terminals.
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to
third parties without express authority is strictly forbidden. © ABB Switzerland Ltd
Summary of Contents for ETL600
Page 4: ......
Page 32: ......
Page 126: ......
Page 176: ......
Page 206: ......
Page 216: ......
Page 226: ......
Page 264: ......
Page 268: ......
Page 276: ......
Page 284: ......
Page 308: ......
Page 324: ......
Page 346: ......
Page 348: ......
Page 366: ......
Page 372: ......
Page 374: ......
Page 380: ......