C.5.1 Adjust Tx RF level
Dialog box: Adjust Tx RF level
Click Start or Set
RF line monitor on RF
hybrid or RF line (X175)
value indicated
in dialog box
[ ]
C.5.2
Adjust Tx alarm level
Dialog box: Adjust Tx alarm level
Click Activate Tx alarm level, set
jumper CH and turn
4
potentiometer
R116 on P1LA till LED on it lights
LED to be ON
[ ]
Tx alarm indication:
RF hybrid & - in case of
80W - combiner
LED to be ON
[ ]
State of HW alarm relay after
programmed delay.
Pins 2-3 of V9OT cable Closed
[ ]
Turn
3
potentiometer R116 on P1LA
till LED on it goes off.
LED to be OFF
[ ]
Tx alarm indication
RF hybrid & - in case of
80W - combiner
LED to be OFF
[ ]
State of HW alarm relay after
programmed delay.
Click OK.
Pins 2-3 of V9OT cable Open
[ ]
C.6 Receiver
C.6.1 Adjust Rx RF level
Menu: Equipment Commissioning
and maintenance, dialog box: Adjust
Rx RF level
Follow the instructions in the dialog
box
Line attenuation
Dialog box
__________ dB
Increase of receive level (due to
parallel PLC links)
Dialog box
__________ dB
Adjustment performed
[ ]
C.6.2 Connect RF cable and set alarm
thresholds
1
Alarm thresholds set (Menu:
Configuration / System / Alarm
settings)
Dialog box
[ ]
C.6.3 Check link alarms
Link alarm of the local equipment
Alarm status of the local
equipment
No local link
alarm
[ ]
Link alarm of the remote equipment
No remote link
alarm
[ ]
1
If the remote equipment is operational
© ABB Switzerland Ltd
Form 1KHw001495-EN
Rev. A
Summary of Contents for ETL600
Page 4: ......
Page 32: ......
Page 126: ......
Page 176: ......
Page 206: ......
Page 216: ......
Page 226: ......
Page 264: ......
Page 268: ......
Page 276: ......
Page 284: ......
Page 308: ......
Page 324: ......
Page 346: ......
Page 348: ......
Page 366: ......
Page 372: ......
Page 374: ......
Page 380: ......