![ABB ETL600 Instruction Manual Download Page 189](http://html.mh-extra.com/html/abb/etl600/etl600_instruction-manual_5338189.webp)
ETL600 1KHW001489-EN
ABB Switzerland Ltd
Fig. 6-12 Earth rail R9AL mounted in the bottom rear of the channel subrack P7LC
All cables are mechanically secured to the earth rail by plastic cable
binders. Shield clamps are used to galvanically connect the cable
shields to the earth rail.
Assembly and Installation
November 2005
6-13
Summary of Contents for ETL600
Page 4: ......
Page 32: ......
Page 126: ......
Page 176: ......
Page 206: ......
Page 216: ......
Page 226: ......
Page 264: ......
Page 268: ......
Page 276: ......
Page 284: ......
Page 308: ......
Page 324: ......
Page 346: ......
Page 348: ......
Page 366: ......
Page 372: ......
Page 374: ......
Page 380: ......