Revision: Language:
Page:
ETL600 Commissioning Report
EN
C10/C10
HE
Test
No.
Test procedure
Test point
Permissible
value
Units
Test
result
C.13 V.24
ports
C.13.1
V.24 Port 1
Front plate P4LT/P4LU
BER test
V.24 PORT 1
BER
≤
10
-5
during ____ sec
[ ]
C.13.2
V.24 Port 2
Front plate P4LT/P4LU
BER test
V.24 PORT 2
BER
≤
10
-5
during ____ sec
[ ]
C.13.3
V.24 Port 3
Front plate P4LT/P4LU
BER test
V.24 PORT 3
BER
≤
10
-5
during ____ sec
[ ]
C.13.4
V.24 Port 4
Front plate P4LT/P4LU
BER test
V.24 PORT 4
BER
≤
10
-5
during ____ sec
[ ]
C.13.5
V.24 Port 5
Front plate P4LT/P4LU
BER test
V.24 PORT 5
BER
≤
10
-5
during ____ sec
[ ]
C.13.6
V.24 Port 6
Front plate P4LT/P4LU
BER test
V.24 PORT 6
BER
≤
10
-5
during ____ sec
[ ]
C.14 Documentation
If possible, take printout
of Configuration data for
reference.
[ ]
Save the 'et6' file on
disk with Serial No. of
ETL coded in the file
name, e.g.
‘HE400327C.et6’.
[ ]
C.15 Manual
reset
[ ]
Company:
_________________________________
Department:
_________________________________
Date:
_________________________________
Signed:
_________________________________
Visa:
_________________________________
© ABB Switzerland Ltd
Form 1KHw001495-EN
Rev. A
Summary of Contents for ETL600
Page 4: ......
Page 32: ......
Page 126: ......
Page 176: ......
Page 206: ......
Page 216: ......
Page 226: ......
Page 264: ......
Page 268: ......
Page 276: ......
Page 284: ......
Page 308: ......
Page 324: ......
Page 346: ......
Page 348: ......
Page 366: ......
Page 372: ......
Page 374: ......
Page 380: ......