Presentation / operation
Page 1-10
ABB Control - AC 31
1SBC 260400 R1001-b
06.99
The central unit interrogates the remote units in order to establish an initial image of the
system configuration during initialization.
The remote units are then interrogated with each bus cycle. This enables the recognition of
newly added or removed remote units and the updating of the diagnosis information.
If the central unit receives a message indicating a CRC8 error it will not be signaled
immediately and the frame will not be taken into account. After nine consecutive transmission
errors a “bus error” is signaled by the central unit. The bus error is also signaled to the remote
units after a 250 ms time-out.
3.4. Refresh times / reply times
Bus refresh times and central unit reply times depend on the system configuration, the number
and the type of remote units on the CS 31 bus. The bus refresh and the user programs are
executed in series.
3.4.1. Bus refresh times
The bus refresh time corresponds to the transmission time over the bus. The calculation
corresponds to the addition of all the communication times of the remote units on the bus and
the base time of the master central unit which is 2 ms.
3.4.2. Central unit reply times
The central unit reply time corresponds to the time taken to activate an output after the
activation of an input.
The maximum reply time is obtained by adding the filtering time of the input, the bus refresh
time, the delay time for the output and twice the cycle time.
The filtering time for an input on the 40 and 50 series is 5 ms.
The delay time for a transistor output is considered as null in milliseconds and the delay time
for a relay output is 6 ms.
Comment:
The inputs / outputs of central units and their extensions can be accessed, for rapid
processing, independently of the cycle time with the user program functions DI and DO (see
chapter 6).
The cycle time calculation is given in chapter 5 at the cycle time configuration level as well as
the communication times of each unit for the bus transmission times calculation.
Summary of Contents for AC 31
Page 1: ...Technical Manual Advant Controller 31 40 50 Series 1SBC 260400 R 1001 b ...
Page 7: ......
Page 43: ......
Page 45: ...Technical specifications Page 3 2 ABB Control AC 31 1SBC 260400 R1001 b 06 99 ...
Page 83: ......
Page 85: ...Installation Page 4 2 ABB Control AC 31 1SBC 260400 R1001 b 06 99 ...
Page 109: ......
Page 130: ...Programming ABB Control AC 31 Page 5 21 1SBC 260400 R1001 b 06 99 ...
Page 182: ...Communication ABB Control AC 31 Page 7 11 1SBC 260400 R1001 b 06 99 ...
Page 189: ......
Page 203: ......
Page 217: ......
Page 218: ...AC 31 technical documentation ABB Control AC 31 Index Page 1 1SBC 260400 R1001 b 06 99 Index ...