5.5. NOR operation
The NOR diagram has a status of 0 if one of the inputs has a status of 1.
%O62.00
%I62.01
%I62.00
%I62.00
%I62.01
/
%O62.00
%I62.02
%I62.03
%I62.02
%I62.03
A NOR diagram has the same function as an AND diagram with complemented inputs.
%O62.00
%I62.01
%I62.00
%I62.00
%I62.01
&
%O62.00
5.6. Combinations of Boolean functions
The following example describes the association between Boolean functions.
It is not necessary to pass via intermediate variables as shown in the figure below.
&
&
%I62.00
%I62.01
%I62.02
%I62.03
/
%O62.00
%O62.00
%I62.00
%I62.01
%I62.02
%I62.03
If the intermediate result is required further on in the program, the result of each base function
is placed in the intermediate variables as shown following:
%I62.00
%I62.01
%I62.02
%I62.03
%M000.00
%M000.01
%O62.00
%M000.01
%M000.00
Summary of Contents for AC 31
Page 1: ...Technical Manual Advant Controller 31 40 50 Series 1SBC 260400 R 1001 b ...
Page 7: ......
Page 43: ......
Page 45: ...Technical specifications Page 3 2 ABB Control AC 31 1SBC 260400 R1001 b 06 99 ...
Page 83: ......
Page 85: ...Installation Page 4 2 ABB Control AC 31 1SBC 260400 R1001 b 06 99 ...
Page 109: ......
Page 130: ...Programming ABB Control AC 31 Page 5 21 1SBC 260400 R1001 b 06 99 ...
Page 182: ...Communication ABB Control AC 31 Page 7 11 1SBC 260400 R1001 b 06 99 ...
Page 189: ......
Page 203: ......
Page 217: ......
Page 218: ...AC 31 technical documentation ABB Control AC 31 Index Page 1 1SBC 260400 R1001 b 06 99 Index ...