21 / 128
Identification: MD-AL-GI-00
Rev. 1.0 of 21/07/2021 - Application: GID
User’s Manual 1PH 3000TLM-6000TLM-V3
Rev. 1.0 21/07/2021
1x AC output terminal
3x Expansion bolts
3x Self-tapping screw
1x Warranty
Registration
1x user manual
2x warranty card
3.3.
Installation tools
The following tools are required for installation of the inverter and electrical connections; therefore, they
must be prepared before installation.
No.
Tool
Function
1
Drill
Recommended drill bit: 6mm
To drill holes in the wall for
fixing the bracket
2
Screwdriver
To screw and unscrew screws for
the various connections
3
Wire stripper
To prepare the cables for wiring