
JOHNSON CONTROLS
60
FORM 155.33-ICOM2.EN.GB
ISSUE DATE: 12/4/2017
SECTION 5 - COMMISSIONING
JOHNSON CONTROLS
3
FORM 155.31-CL1
ISSUE DATE: 11/20/2017
4. Navigate to the Setting screen in the Control Panel.
5. Press the Operation Mode
Cooling
button. .............
6. Press the Purge Mode
Manual
button to start the
vacuum pump. .........................................................
7. Press the Purge Pump
ON
button. ..........................
8. Check the oil level in the purge pump. .....................
9. Using the vacuum pump, evacuate the nitrogen gas
until the high temperature generator compound gauge
indicates approximately -0.1 MPa.G. (-14.5 PSI) ....
10. Close all open manual valves. .................................
11. Press the Purge Pump
OFF
button. .........................
12. Turn the power switch (MCB) off. .............................
13. Replace or add oil to the purge pump. .....................
G. Panel Checks
1. Thermal relays conform to the factory inspection
sheet. ......................................................................
2. Interlock and answerback signal(s) for the follow-
ing are available:
a. Chilled / hot water pump ......................................
b. Cooling water pump .............................................
c. Exhaust gas generation facility. ...........................
3. Indicators on the Control Panel are correct....
4. The temperature setting parameters for capac-
ity control are correct.............................................
5. Date and time reflect local time zone.....................
6. The rotation direction is correct for the following:
a. Solution circulation pump ....................................
b. Solution spray pump ............................................
c. Refrigerant pump .................................................
d. Air purge blower motor. ......................................
7. The water flow suspension switch works properly....
NOTES:
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
START UP CHECKLIST
A. Operation Check
1. Manually start the chilled / hot water pump, the cool-
ing water pump, and the waste hot water pump.. ....
2. Confirm the water box covers do not leak during
water pump operation. ............................................
3. Stop the chilled / hot water pump, the cooling water
pump, and the waste hot water pump manually. ......
4. Press the
Auto
button for each water pump. ..........
5. Open the refrigerant manual blow valve. .................
6. Navigate to the Setting screen in the Control Panel.
7. Make sure that the Refrigerant Pump
AUTO
button
is pressed. ................................................................
8. Make sure that the air purge blower operates. ........
9. Make sure the air purge damper opens. ..................
10. Press the Purge Mode
Manual
button. ....................
11. Press the Manual Purge
ON
button to start the vac-
uum pump. ...............................................................
12. Use the vacuum pump to continuously purge the
non-condensable gas from the absorber. See
SEC-
TION 7 - MAINTENANCE
for more information . .....
13. Press the
OPER.
button on the Control Panel. ........
14. Check that the following start properly::
a. Solution circulation pump ....................................
b. Solution spray pump ............................................
c. Refrigerant pump .................................................
15. Makes sure that the air purge blower stops. ............
16. Make sure that the air purge damper closes when
the exhaust gas input starts. ....................................
17. Check for abnormal noise or vibration. ....................
18. Check that the pressure drop of the XG inlet and
outlet is within suitable range. ..................................
Содержание YHAU-CE-JE Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...JOHNSON CONTROLS 22 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 120: ...JOHNSON CONTROLS 120 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 135: ...JOHNSON CONTROLS 135 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 9 THIS PAGE INTENTIONALLY LEFT BLANK...