SECTION 7 – MAINTENANCE
Work Procedure
1. If the quality of the remaining cooling water has
deteriorated, drain all the cooling water from the
absorber and the condenser.
2. Flow clean water from a higher location than the
chiller-heater. Then feed the clean water continu-
ously and clean the tubes well.
3. Fill the absorber and the condenser with clean wa-
ter.
4. Circulate the clean water with the cooling water
pump for 30 min. to 1 hour.
5. Drain all of the cooling water from the absorber
and condenser.
6. Fill the absorber and condenser with clean water.
7. The unit is ready to operate in heating or simul-
taneous heating mode during the heating season.
Do NOT leave any water in the absorber
and condenser tubes after draining them.
If you do, the heat transfer tubes will be
at high risk for corrosion.
LD21006
Cooling
Tower
Open/close signal for three way valve
Start/stop signal for cooling tower fan
Strainer
Thermometer
Drain valve
Thermometer
Cooling water pump
Close
Filled with water
P
T
T
Drain valve
Chiller-Heater
Close
Close
Open
Slightly
FIGURE 39 -
WET STORAGE DURING HEATING PERIOD
Содержание YHAU-CE-JE Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...JOHNSON CONTROLS 22 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 120: ...JOHNSON CONTROLS 120 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 135: ...JOHNSON CONTROLS 135 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 9 THIS PAGE INTENTIONALLY LEFT BLANK...