SECTION 5 - COMMISSIONING
JOHNSON CONTROLS
1
The following work must be completed in accordance with installation instructions:
CUSTOMER: ____________________________________
ADDRESS: _____________________________________
PHONE: ________________________________________
JCI TEL NO: _____________________
JCI ORDER NO: __________________ JCI CONTRACT NO: ______________
JOB NAME: ____________________________________
LOCATION: ____________________________________
CUSTOMER ORDER NO: _________________________
UNIT MODEL NO
: ____________________________
The work (as checked below) is in process and will be completed by: _____________ / ____________ /
___________
UNIT SERIAL NO
: _______________________________
Month
Day
Year
A. General
1. All major pieces, boxes, and crates have been
received and accounted for by a YORK/Johnson
Controls Service Representative. ...........................
2. Any damage, or signs of possible damage, have
been documented to the transportation company ....
3. Unit installed in an area protected from weather
and maintained at a temperature above freezing. ...
4. Vibration-proof rubber sheets are installed between
the chiller-heater base and the site foundation. .......
5. Unit is located in accordance with minimum clear-
ance dimensions. (Required maintenance space is
available around the machine). ................................
6. Foundation bolts are properly installed. ...................
7. The levelness of the unit is within acceptable range
(The tolerance for leveling length and width: 1.0
mm for every 1,000 mm). ........................................
8. High temperature generator compound gauge
displays the same pressure reading, or nearly the
same reading as prior to shipment. .........................
9. Thermal insulation is done according to the specifi-
cations detailed in this manual. ................................
10. The following items are NOT covered with insulation:
a. Valves ..................................................................
b. Thermo wells .......................................................
c. Plugs ....................................................................
d. Sight glasses .......................................................
PRE-START UP
CHECKLIST
YHAU-CE-JE EXHAUST GAS
ABSORPTION CHILLER - HEATER
New Release
Form 155.33-CL1 (1117)
CHILLER-HEATER START UP AND COMMISSIONING CHECKLIST
11. No electric cable contacts with the high tempera-
ture part of the exhaust gas line ...............................
B. Piping
1. Piping is installed between the unit and the source
of supply. ..................................................................
2. The following and its related equipment are ready
for operation:
a. Chilled / hot water pump .....................................
b. Cooling water pump .............................................
c. Cooling tower fan .................................................
d. Waste hot water pump .........................................
e. Exhaust gas generation facility ............................
3. Detachable flanges are properly installed close to the:
a. Chilled / hot water box. ........................................
b. Cooling water box ................................................
c. Waste hot water box ............................................
4. A mesh strainer is installed on the:
a. Chilled / hot water inlet line ..................................
b. Cooling water inlet line ........................................
c. Waste hot water line ............................................
5. Air piping work is complete, leak tested, and
flushed for the following lines:
a. Chilled / hot water ................................................
b. Cooling water .......................................................
c. Exhaust gas .........................................................
d. Waste hot water ...................................................
Содержание YHAU-CE-JE Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...JOHNSON CONTROLS 22 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 120: ...JOHNSON CONTROLS 120 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 135: ...JOHNSON CONTROLS 135 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 9 THIS PAGE INTENTIONALLY LEFT BLANK...