
JOHNSON CONTROLS
56
FORM 155.33-ICOM2.EN.GB
ISSUE DATE: 12/4/2017
SECTION 5 - COMMISSIONING
EG input stop
preparation starts
Bypass damper open
limit signal detected?
Air purge damper open
operation starts
Inlet damper close
operation starts
No
Air purge blower starts
FIGURE 23 -
EXHAUST GAS INPUT STOP PREPARATION FLOW DIAGRAM
Chiller-heater stops with
failure alarm
No
Chiller-heater stops with
failure alarm
Yes
Air purge damper open
limit signal detected?
Outlet damper close
operation starts
Inlet and Outlet
damper close limit signal
detected?
No
Chiller-heater stops with
failure alarm
Yes
Yes
Bypass damper open
operation starts
EG input stop preparation
completed
Содержание YHAU-CE-JE Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...JOHNSON CONTROLS 22 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 120: ...JOHNSON CONTROLS 120 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 135: ...JOHNSON CONTROLS 135 FORM 155 33 ICOM2 EN GB ISSUE DATE 12 4 2017 9 THIS PAGE INTENTIONALLY LEFT BLANK...