Maintenance - 192
RT70 Operator’s Manual
Trencher Procedures
Pivot
Wipe four zerks (shown) located on right side of
trencher pivot clean and lube with EPG every 10
hours.
Wipe four zerks (shown) located on left side of
trencher pivot clean and lube with EPG every 10
hours.
Restraint Bar Position
Check every 10 hours or anytime the digging
chain is adjusted or replaced.
1. Ensure end of bar extends between the
center of the tail roller/sprocket and the end
of the digging chain.
2. Check for looseness or wear.
t63om071h21.eps
t63om071h21.eps
t63om091h21.eps
t63om091h21.eps
t63om072h21.eps
t63om072h21.eps
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...