Trench - 124
RT70 Operator’s Manual
Set Up
Set Up
1. If using optional trench cleaner, remove bolt installed for transport (shown).
2. Fasten and adjust seat belt.
3. Start machine.
4. Drive to starting point. Move in line with planned trench.
5. Set parking brake.
6. Select low ground drive speed.
7. Lower boom to just above ground.
8. Check that attachment speed/direction and ground drive controls are in neutral.
9. Lower backfill blade, if equipped, to reduce shock when trenching begins.
IMPORTANT:
• When cutting asphalt, start trench in soil
at edge of road and use shortest possible
boom at full depth.
• Sight along center of hood to a stake
driven beyond end of trench line for
straight trench.
• For optimal spoils delivery, adjust the
auger positions forward or backward to
accommodate terrain and digging depth.
t33om080w.eps
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...