Reel Carrier - 120
RT70 Operator’s Manual
Set Up
Set Up
Install Reel
1. Start engine.
2. Lower reel carrier.
3. Shut off machine.
4. Install reel.
Prepare to Plow
1. Fasten and adjust seat belt.
2. Start engine.
3. Drive to beginning of planned plow path.
4. Set parking brake and verify parking brake indicator is on.
5. Lower backfill blade, if equipped.
Operate
1. Lower plow.
2. Shut off engine.
3. Attach service line to reel.
4. Fasten and adjust seat belt.
5. Start engine.
6. Enable reel winder operation.
7. Lower reel winder arm until track meets reel flange.
8. Wind service line.
NOTICE:
Large reels of conduit or cable may obstruct the forward visibility of the operator.
Machines with limited forward visibility should be driven only with the help of a spotter.
Moving parts. Contact can cause serious injury.
Stay away.
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...