Prepare - 32
RT70 Operator’s Manual
Prepare Jobsite
Prepare Jobsite
A successful job begins before working. The first step in planning is reviewing information already
available about the job and jobsite.
Review Job Plan
Review blueprints or other plans. Check for information about existing or planned structures, elevations,
or proposed work that may be taking place at the same time.
Select Start and End Points
Select one end to use as a starting point. Consider the following when selecting a starting point:
Slope
Equipment should be parked on a level site. Consider how slope will affect setup and operation. Assess
the risks on each slope to determine if factors affecting risks create an unsafe condition for working. See
“Slope Guidelines” on page 74.
Space
Check that starting and ending points allow enough space for working.
Comfort
Consider shade, wind, fumes, and other site features.
Underground utilities. Contact can cause death or serious
injury. Locate and verify underground utilities before digging or drilling.
To help avoid injury:
• Expose lines by careful hand digging or soft excavation before operating equipment. Use
appropriate equipment and procedures for exposing utility lines.
• Classify jobsite and follow precautions based on classification.
• Follow local regulations for digging near utilities.
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...