Maintenance - 190
RT70 Operator’s Manual
Trencher Procedures
Digging Chain Tension
Check every 10 hours. Adjust as needed.
1. With boom horizontal, measure distance from
bottom of boom to chain (2). When properly
adjusted, distance should be 4.5-5.5” (114-
140mm).
2. To tighten chain, lube cylinder (1) with MPG.
To relieve chain tension, loosen plug on grease
cylinder.
Contents under pressure. Impact can cause death or
serious injury. Relieve pressure before opening.
To help avoid injury:
• Service digging boom grease cylinder only while standing on opposite side of boom.
• Cover connection with heavy cloth when relieving pressure in cylinder.
1
1
22
t63om069h21.eps
t63om069h21.eps
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...