RT70 Operator’s Manual
Maintenance - 189
Trencher Procedures
Install Chain
1. Lay chain on ground with teeth down and pointed toward unit.
2. Fasten and adjust seat belt.
3. Start engine.
4. Release parking brake.
5. Back unit up until chain extends past headshaft about 1’ (305mm).
6. Stop machine movement.
7. Lower backfill blade, if equipped, to ground.
8. Lower boom to horizontal position.
9. Set parking brake.
10. Shut off machine.
11. Pull rear end of chain over and about 10” (260mm) past tail roller.
12. Use hoist to pull front end of chain over headshaft sprocket.
13. Move chain down boom until chain connector pin and lock key can be installed.
14. Install connector pin and lock key.
15. Tighten chain by pumping EPG into grease cylinder.
Time Augers
Ensure augers are balanced, as shown. If auger
timing is off, machine will bounce from side to
side even in normal digging conditions.
1. Remove bolts holding augers to auger shaft.
2. Rotate either auger as needed until augers
are balanced.
3. Install bolts.
4. Tighten.
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...