RT70 Operator’s Manual
Transport - 93
Haul
Traversing Trencher
Lower attachment to trailer bed and chain at
attachment frame and through boom. Ensure
chains are tight before transporting.
Reel Carrier
Lower attachment to lowest position as shown.
Plow
Lower attachment to trailer bed and chain at
attachment frame and vibrator box. Ensure chains
are tight before transporting.
IMPORTANT:
If trencher is equipped with a
trench cleaner, ensure that trench cleaner shoe
is fully raised and extra bolt (found in
operator’s manual compartment) is installed in
appropriate hole for additional support.
NOTICE:
Engage attachment stow lock and
swing lock devices in addition to securing at
tiedowns.
t63om021h21.eps
t63om021h21.eps
t63om022h21.eps
t63om022h21.eps
t63om023h21.eps
t63om023h21.eps
Содержание RT70
Страница 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Страница 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Страница 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Страница 83: ...Controls 82 RT70 Operator s Manual Seat ...
Страница 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Страница 97: ...Transport 96 RT70 Operator s Manual Haul ...
Страница 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Страница 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Страница 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Страница 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Страница 145: ...Maintenance 144 RT70 Operator s Manual Trencher Maintenance Interval Chart 183 Trencher Procedures 184 ...
Страница 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...