6 - 12
–
+
ELEC
CLUTCH SWITCH INSPECTION
1. Inspect:
●
Clutch switch continuity
No continuous while being pulled
→
Replace.
Continuous while being freed
→
Replace.
Tester (+) lead
→
Black lead
1
Tester (–) lead
→
Black lead
2
B
1
B
2
Tester selec-
tor position
PULL
Ω
×
1
FREE
B
B
1
2
START SWITCH INSPECTION
1. Inspect:
●
Start switch continuity
No continuous while being pushed
→
Replace.
Continuous while being freed
→
Replace.
Tester (+) lead
→
Black lead
1
Tester (–) lead
→
Black lead
2
B
1
B
2
Tester selec-
tor position
PUSH IN
Ω
×
1
FREE
B
B
1
2
ELECTRIC STARTING SYSTEM (TT-R125E/TT-R125LWE)
Содержание TT-R125(W) 2006
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 49: ...GEN INFO MEMO...
Страница 185: ...INSP ADJ MEMO...
Страница 256: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 257: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 310: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 577: ...ELEC MEMO...
Страница 591: ...ELEC MEMO...
Страница 611: ...ELEC MEMO...
Страница 614: ......
Страница 615: ......