3 - 3
INSP
ADJ
PRE-OPERATION INSPECTION AND MAINTENANCE
PRE-OPERATION INSPECTION AND MAINTENANCE
Before riding for break-in operation or practice, make sure the machine is in good operating condi-
tion.
Before using this machine, check the following points.
GENERAL INSPECTION AND MAINTENANCE
Item
Routine
Page
Fuel
Check that a fresh gasoline is filled in the fuel tank. Check the
fuel line for leakage.
P.1-12
Engine oil
Check that the oil level is correct. Check the crankcase for leak-
age.
P.3-7 ~ 10
Gear shifter and clutch
Check that gears can be shifted correctly in order and that the
clutch operates smoothly.
P.3-4
Throttle grip/housing
Check that the throttle grip operation and free play are correctly
adjusted. Lubricate the throttle grip and housing, if necessary.
P.3-4 ~ 5
Brakes
Check the play of front and rear brake and effect of front and
rear brake.
Check fluid level and leakage. (TT-R125LW/TT-R125LWE only)
P.3-15 ~ 20
Drive chain
Check chain slack and alignment. Check that the chain is lubri-
cated properly.
P.3-21 ~ 22
Wheels
Check for excessive wear and tire pressure. Check for loose
spokes and have no excessive play.
P.3-27 ~ 28
Steering
Check that the handlebar can be turned smoothly and have no
excessive play.
P.3-28 ~ 32
Front forks and rear shock
absorber assembly
Check that they operate smoothly and there is no oil leakage.
P.3-23 ~ 26
Cables (wires)
Check that the clutch and throttle cables move smoothly. Check
that they are not caught when the handlebars are turned or
when the front forks travel up and down.
—
Muffler
Check that the muffler is tightly mounted and has no cracks.
P.4-2
Sprocket
Check that the driven sprocket tightening nut is not loose.
P.3-20
Lubrication
Check for smooth operation. Lubricate if necessary.
P.3-33
Bolts and nuts
Check the chassis and engine for loose bolts and nuts.
—
Lead connectors
Check that the CDI magneto, CDI unit, and ignition coil are con-
nected tightly.
P.1-5
Содержание TT-R125(W) 2006
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 49: ...GEN INFO MEMO...
Страница 185: ...INSP ADJ MEMO...
Страница 256: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 257: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 310: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 577: ...ELEC MEMO...
Страница 591: ...ELEC MEMO...
Страница 611: ...ELEC MEMO...
Страница 614: ......
Страница 615: ......