–
+
ELEC
6 - 3
IGNITION SYSTEM
EC620000
IGNITION SYSTEM
INSPECTION STEPS
Use the following steps for checking the possibility of the malfunctioning engine being attributable to
ignition system failure and for checking the spark plug which will not spark.
*marked: Only when the ignition checker is used.
NOTE:
●
Remove the following parts before inspection.
1) Seat
2) Fuel tank
●
Use the following special tools in this inspection.
Dynamic spark tester:
YM-34487
Ignition checker:
90890-06754
Pocket tester:
YU-3112-C/90890-03112
Spark gap test
*Clean or replace
spark plug.
Check entire ignition
system for connection.
Repair or replace.
Check main switch.
(TT-R125E/TT-R125LWE
only)
Replace.
Check engine stop switch.
Replace.
Check ignition coil.
Primary coil
Replace.
Secondary coil
Replace.
Check CDI magneto.
Pickup coil
Replace.
Source coil
Replace.
Replace CDI unit.
No Spark
OK
OK
OK
OK
Spark
No good
No good
No good
No good
No good
No good
OK
No good
Содержание TT-R125(W) 2006
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 49: ...GEN INFO MEMO...
Страница 185: ...INSP ADJ MEMO...
Страница 256: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 257: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 310: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 577: ...ELEC MEMO...
Страница 591: ...ELEC MEMO...
Страница 611: ...ELEC MEMO...
Страница 614: ......
Страница 615: ......