ELECTRICAL COMPONENTS
8-62
TIP
Voltage should be measured 30 minutes after
the engine is stopped.
b. Connect a charger and ammeter to the bat-
tery and start charging.
TIP
Set the charging voltage to 16–17 V. If the set-
ting is lower, charging will be insufficient. If too
high, the battery will be over-charged.
c. Make sure that the current is higher than the
standard charging current written on the bat-
tery.
TIP
If the current is lower than the standard charging
current written on the battery, set the charging
voltage adjust dial at 20–24 V and monitor the
amperage for 3–5 minutes to check the battery.
d. Adjust the voltage so that the current is at the
standard charging level.
e. Set the time according to the charging time
suitable for the open-circuit voltage.
f. If charging requires more than 5 hours, it is
advisable to check the charging current after
a lapse of 5 hours. If there is any change in
the amperage, readjust the voltage to obtain
the standard charging current.
g. Measure the battery open-circuit voltage after
leaving the battery unused for more than 30
minutes.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
Charging method using a constant volt-
age charger
a. Measure the open-circuit voltage prior to
charging.
TIP
Voltage should be measured 30 minutes after
the engine is stopped.
b. Connect a charger and ammeter to the bat-
tery and start charging.
c. Make sure that the current is higher than the
standard charging current written on the bat-
tery.
TIP
If the current is lower than the standard charging
current written on the battery, this type of battery
charger cannot charge the VRLA (Valve Regu-
lated Lead Acid) battery. A variable voltage
charger is recommended.
d. Charge the battery until the battery’s charg-
ing voltage is 15 V.
TIP
Set the charging time at 20 hours (maximum).
e. Measure the battery open-circuit voltage after
leaving the battery unused for more than 30
minutes.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
6. Install:
• Battery
7. Connect:
• Battery leads
(to the battery terminals)
NOTICE
ECA13630
First, connect the positive battery lead “1”,
and then the negative battery lead “2”.
8. Check:
• Battery terminals
Dirt
→
Clean with a wire brush.
Loose connection
→
Connect properly.
9. Lubricate:
• Battery terminals
• Standard charging current is reached
Battery is good.
• Standard charging current is not reached
Replace the battery.
12.8 V or more --- Charging is complete.
12.7 V or less --- Recharging is required.
Under 12.0 V --- Replace the battery.
12.8 V or more --- Charging is complete.
12.7 V or less --- Recharging is required.
Under 12.0 V --- Replace the battery.
Recommended lubricant
Dielectric grease
2
1
Содержание MBK MW125 2014
Страница 1: ...SERVICE MANUAL MW125 2014 MW125F 2015 2CM F8197 E0...
Страница 6: ......
Страница 8: ......
Страница 49: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 20...
Страница 52: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23 EAS30021 LUBRICATION DIAGRAMS 1 3 2...
Страница 53: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 24 1 Oil strainer 2 Oil pump assembly 3 Camshaft...
Страница 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 2 3 4 5 1...
Страница 56: ...COOLING SYSTEM DIAGRAMS 2 27 EAS20020 COOLING SYSTEM DIAGRAMS 1 2 4 3 5 6 9 8 3 4 5 7...
Страница 60: ...CABLE ROUTING 2 31 Steering head left side view A A A A 1 2 2 2 1 1 2 1 2 1 2 B...
Страница 62: ...CABLE ROUTING 2 33 Front wheel left side view 1 2 1 1 1...
Страница 63: ...CABLE ROUTING 2 34 1 Speed sensor lead 2 Front brake hose...
Страница 64: ...CABLE ROUTING 2 35 Throttle body and rear wheel left and right side view 2 2 1 1 A B A C D D E E F G H D E 3...
Страница 66: ...CABLE ROUTING 2 37 Front frame right side view...
Страница 70: ...CABLE ROUTING 2 41 Front frame left side view 1 2 3 4 5 6 7 8 9 10 A 4 7 5 6 11 13 12...
Страница 74: ...CABLE ROUTING 2 45 Front frame top view 1 2 3 4 2 3 4 5 6 12 10 11 13 7 8 8 9 A 2 3 5 4 6...
Страница 76: ...CABLE ROUTING 2 47 Rear frame top view 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B...
Страница 78: ...CABLE ROUTING 2 49...
Страница 81: ......
Страница 129: ...GENERAL CHASSIS 8 4 20 a Fit the projections on the front side panel into the slots in the side cowling...
Страница 205: ...ENGINE INSPECTION 5 2 10 Install Center cover Refer to GENERAL CHASSIS 1 on page 4 1...
Страница 248: ...V BELT AUTOMATIC TRANSMISSION 5 45 a 1 2...
Страница 270: ...CRANKSHAFT 5 67...
Страница 282: ...WATER PUMP 6 11...
Страница 287: ...FUEL TANK 7 4 Refer to INSTALLING THE FUEL TANK on page 7 2...
Страница 296: ...THROTTLE BODY 7 13...
Страница 298: ...IGNITION SYSTEM 8 1 EAS20072 IGNITION SYSTEM EAS30490 CIRCUIT DIAGRAM...
Страница 302: ...ELECTRIC STARTING SYSTEM 8 5 EAS20073 ELECTRIC STARTING SYSTEM EAS30493 CIRCUIT DIAGRAM...
Страница 307: ...ELECTRIC STARTING SYSTEM 8 10...
Страница 308: ...CHARGING SYSTEM 8 11 EAS20074 CHARGING SYSTEM EAS30496 CIRCUIT DIAGRAM...
Страница 311: ...CHARGING SYSTEM 8 14...
Страница 312: ...LIGHTING SYSTEM 8 15 EAS20075 LIGHTING SYSTEM EAS30498 CIRCUIT DIAGRAM...
Страница 316: ...SIGNALING SYSTEM 8 19 EAS20076 SIGNALING SYSTEM EAS30500 CIRCUIT DIAGRAM...
Страница 322: ...FUEL INJECTION SYSTEM 8 25 EAS20078 FUEL INJECTION SYSTEM EAS30504 CIRCUIT DIAGRAM...
Страница 349: ...FUEL INJECTION SYSTEM 8 52...
Страница 350: ...ELECTRICAL COMPONENTS 8 53 EAS20089 ELECTRICAL COMPONENTS 1 2 3 4 5 6 9 11 12 10 8 7 13 17 18 19 23 22 21 20 14 15 16...
Страница 366: ...ELECTRICAL COMPONENTS 8 69...
Страница 375: ...SELF DIAGNOSTIC FUNCTION AND DIAGNOSTIC CODE TABLE 9 8...
Страница 377: ......
Страница 378: ......