FUEL INJECTION SYSTEM
8-26
1. Crankshaft position sensor
4. Main switch
5. Backup fuse
6. Signaling system fuse
7. Headlight fuse
8. Battery
9. Negative battery lead connector
10.Main fuse
13.Sidestand switch
18.Coolant temperature sensor
19.Intake air pressure sensor
20.Intake air temperature sensor
21.Throttle position sensor
22.ECU (engine control unit)
23.Ignition coil
24.Spark plug
25.Fuel injector
26.Fuel pump
28.Engine ground
29.ISC (idle speed control) unit
30.O
2
sensor
31.Lean angle sensor
32.Yamaha diagnostic tool
34.Meter assembly
35.Multifunction meter
40.Engine trouble warning light
47.Headlight relay
60.Frame ground
Содержание MBK MW125 2014
Страница 1: ...SERVICE MANUAL MW125 2014 MW125F 2015 2CM F8197 E0...
Страница 6: ......
Страница 8: ......
Страница 49: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 20...
Страница 52: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23 EAS30021 LUBRICATION DIAGRAMS 1 3 2...
Страница 53: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 24 1 Oil strainer 2 Oil pump assembly 3 Camshaft...
Страница 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 2 3 4 5 1...
Страница 56: ...COOLING SYSTEM DIAGRAMS 2 27 EAS20020 COOLING SYSTEM DIAGRAMS 1 2 4 3 5 6 9 8 3 4 5 7...
Страница 60: ...CABLE ROUTING 2 31 Steering head left side view A A A A 1 2 2 2 1 1 2 1 2 1 2 B...
Страница 62: ...CABLE ROUTING 2 33 Front wheel left side view 1 2 1 1 1...
Страница 63: ...CABLE ROUTING 2 34 1 Speed sensor lead 2 Front brake hose...
Страница 64: ...CABLE ROUTING 2 35 Throttle body and rear wheel left and right side view 2 2 1 1 A B A C D D E E F G H D E 3...
Страница 66: ...CABLE ROUTING 2 37 Front frame right side view...
Страница 70: ...CABLE ROUTING 2 41 Front frame left side view 1 2 3 4 5 6 7 8 9 10 A 4 7 5 6 11 13 12...
Страница 74: ...CABLE ROUTING 2 45 Front frame top view 1 2 3 4 2 3 4 5 6 12 10 11 13 7 8 8 9 A 2 3 5 4 6...
Страница 76: ...CABLE ROUTING 2 47 Rear frame top view 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B...
Страница 78: ...CABLE ROUTING 2 49...
Страница 81: ......
Страница 129: ...GENERAL CHASSIS 8 4 20 a Fit the projections on the front side panel into the slots in the side cowling...
Страница 205: ...ENGINE INSPECTION 5 2 10 Install Center cover Refer to GENERAL CHASSIS 1 on page 4 1...
Страница 248: ...V BELT AUTOMATIC TRANSMISSION 5 45 a 1 2...
Страница 270: ...CRANKSHAFT 5 67...
Страница 282: ...WATER PUMP 6 11...
Страница 287: ...FUEL TANK 7 4 Refer to INSTALLING THE FUEL TANK on page 7 2...
Страница 296: ...THROTTLE BODY 7 13...
Страница 298: ...IGNITION SYSTEM 8 1 EAS20072 IGNITION SYSTEM EAS30490 CIRCUIT DIAGRAM...
Страница 302: ...ELECTRIC STARTING SYSTEM 8 5 EAS20073 ELECTRIC STARTING SYSTEM EAS30493 CIRCUIT DIAGRAM...
Страница 307: ...ELECTRIC STARTING SYSTEM 8 10...
Страница 308: ...CHARGING SYSTEM 8 11 EAS20074 CHARGING SYSTEM EAS30496 CIRCUIT DIAGRAM...
Страница 311: ...CHARGING SYSTEM 8 14...
Страница 312: ...LIGHTING SYSTEM 8 15 EAS20075 LIGHTING SYSTEM EAS30498 CIRCUIT DIAGRAM...
Страница 316: ...SIGNALING SYSTEM 8 19 EAS20076 SIGNALING SYSTEM EAS30500 CIRCUIT DIAGRAM...
Страница 322: ...FUEL INJECTION SYSTEM 8 25 EAS20078 FUEL INJECTION SYSTEM EAS30504 CIRCUIT DIAGRAM...
Страница 349: ...FUEL INJECTION SYSTEM 8 52...
Страница 350: ...ELECTRICAL COMPONENTS 8 53 EAS20089 ELECTRICAL COMPONENTS 1 2 3 4 5 6 9 11 12 10 8 7 13 17 18 19 23 22 21 20 14 15 16...
Страница 366: ...ELECTRICAL COMPONENTS 8 69...
Страница 375: ...SELF DIAGNOSTIC FUNCTION AND DIAGNOSTIC CODE TABLE 9 8...
Страница 377: ......
Страница 378: ......