POWER UNIT
REMOVING/INSTALLING THE LEFT SIDE ELECTRICAL COMPONENTS 1 (F8CW)
Step
Job/Part
Q'ty
Remarks
1
Clamp
1
Not reusable
2
Bolt (with washer)
2
3
Ignition coil
1
2 leads (Orange, Black)
4
Bolt (with washer)
1
5
Clamp
1
6
Clamp
1
Not reusable
7
Bolt (with washer)
1
8
Rectifier/regulator
1
4 leads (Black, Red, Green x 2)
9
Nut
1
10
Starter motor lead
1
Black
11
Bolt (with washer)
2
12
Starter motor
1
13
Bolt (with washer)
2
Continued on next page.
5-26
Содержание F6AMH
Страница 68: ...MAINTENANCE SPECIFICATIONS OUTBOARD DIMENSIONS F6AMH F6BMH F8CMH 2 15 ...
Страница 72: ...MAINTENANCE SPECIFICATIONS OUTBOARD DIMENSIONS F6AMH F6MH F8CMH F8MH 2 17 ...
Страница 76: ...MAINTENANCE SPECIFICATIONS OUTBOARD DIMENSIONS F8CW 2 19 ...
Страница 140: ...GENERAL LUBRICATION POINTS Apply Water resistant grease NOTE Use a grease gun 3 25 ...
Страница 142: ...GENERAL 3 26 ...
Страница 143: ...GENERAL ALLGEMEINES GENERAL 3 26 ...
Страница 222: ...POWER UNIT Step Job Part Q ty Remarks 14 Pulser coil 1 For installation reverse the removal procedure 5 21 ...
Страница 378: ...STEERING HANDLE Step Job Part Q ty Remarks 14 Steering handle 1 For installation reverse the removal procedure 7 7 ...
Страница 488: ...CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 TROUBLE SHOOTING FOR PEAK VOLTAGE 9 3 ...
Страница 502: ......
Страница 503: ......
Страница 510: ...Printed on recycled paper Printed in JAPAN Mar 2000 2 8 x 1 SY F6AMH F6BMH F8CMH F8CW YAMAHA MOTOR CO LTD ...