41
E
2. Install:
• Grommet
1
• Wiring harness
2
• Battery cable
3
• Warning indicator lead
4
NOTE:
Align the taped end
a
of the battery cable with
the end of the grommet.
3. Install:
• Cable stopper
1
• Rubber seal
2
• Shift cable
3
• Throttle cable
4
4. Adjust:
• Shift cable joint position
5. Check:
• Shift operation
Unsmooth operation
→
Adjust.
Adjustment steps:
• Set the shift lever
1
to the neutral posi-
tion.
• Set the shift rod
2
to the neutral position.
• Adjust the position of the cable joint
3
until its hole aligns with the set pin
4
.
• Install the clip
5
, and then tighten the
locknut
6
.
WARNING
The cable joint must be screwed in a
minimum of 8.0 mm (0.31 in).
Checking steps:
• Turn the throttle grip to the fully closed
position.
• Check the shift lever for smooth operation
by shifting the lever from neutral to forward
and reverse.
TillerHandle.book Page 41 Friday, April 12, 2013 3:19 PM
Содержание 50
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5 ...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper ...