169
E
PREPARATION
1. Remove:
• Self-locking nuts
1
• Steering hook
2
or lock plate
• Stud bolts
3
È
F80B, F100D
É
F115A
È
É
2. Remove:
• Bolts
1
• Fitting plate
2
• Bolt
3
• Hose locating plate
4
(F80B, F100D)
• Hose locating plate
5
(F115A)
• Grommet
6
• Bolt
7
• Cable clamp
8
INSTALLATION
1. Install:
È
F80B, F100D
• Stud bolts
1
• Bracket
2
T
R
.
.
Stud bolt:
20.0 N • m
(2.04 kgf • m, 14.8 ft • lb)
È
TillerHandle.book Page 169 Friday, April 12, 2013 3:19 PM
Содержание 50
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5 ...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper ...