139
E
PREPARATION
1. Remove:
• Switch cover
1
(except F115A)
• Screws with washers (M6
×
16 mm)
2
• Handle cover
3
• Bolts
4
• Bracket
5
• Shift cable holder
6
• Throttle cable holder
7
• PTT switch
8
(hydro tilt model)
NOTE:
• Turn the throttle grip to the fully closed posi-
tion.
• Set the shift lever to the neutral position.
6
7
5
4
4
1
8
2
2
3
INSTALLATION
1. Install:
• Warning indicator harness
1
NOTE:
• Pass the warning indicator harness through
the grommet
2
.
• Align the taped end
a
of the warning indica-
tor harness with the end of the grommet.
2
1
a
1
TillerHandle.book Page 139 Friday, April 12, 2013 3:19 PM
Содержание 50
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5 ...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper ...