133
E
10. Adjust:
• Shift cable joint position
Adjustment steps:
• Align the center of the set pin or mark
a
with the mark
b
on the bracket
c
.
• Set the shift lever
1
to the neutral posi-
tion.
• Adjust the position of the shift cable joint
until it aligns with the set pin.
WARNING
The shift cable joint must be screwed in
at least 8.0 mm (0.31 in).
• Install the shift cable joint
2
onto the set
pin
d
.
• Install the clip
3
and tighten the locknut
4
.
11. Check:
• Shift operation
Unsmooth operation
→
Adjust.
Checking steps:
• Turn the throttle grip to the fully closed
position.
• Check the shift lever for smooth operation
by shifting the lever from neutral to forward
and reverse.
TillerHandle.book Page 133 Friday, April 12, 2013 3:19 PM
Содержание 50
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5 ...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper ...