
143
E
3. Install: (
È
Variable trolling RPM switch
models)
• Variable trolling RPM switch
1
NOTE:
• Securely install the variable trolling RPM
switch lead and PTT switch lead into the
guide
2
.
• Route the variable trolling RPM switch lead
3
and the PTT switch lead
4
as shown.
• Route the variable trolling RPM switch lead
over the buzzer
5
and the PTT switch lead
under the buzzer.
• Pass the variable trolling RPM switch lead
through the grommet
6
.
1
È
2
5
2
3
4
3
4
2
2
3
4
È
3
6
È
4. Install:
• Throttle cable holder
1
• Shift cable holder
2
• Bracket
3
• Bolts
4
T
R
.
.
Bolt:
8.0 N • m (0.82 kgf • m, 5.9 ft • lb)
1
4
4
2
3
TillerHandle.book Page 143 Friday, April 12, 2013 3:19 PM
Содержание 50
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5 ...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper ...