33
2.
For the installer
Supplied as standard:
1 ........... Instructions
2 ........... Spatula
3 ........... Hanger (for installation on the wall or boiler side panel)
4 .......... Scraper
5 ........... Cleaning brush
6 .......... Poker
7 ........... Ash pan
2.3.28 Instructions. cleaning and operating implements
– Install the hanger with the instructions folder and cleaning and operating implements on a wall in the boiler room/
installation room.
– Keep ash pan under boiler.
2.3.27 Installing the rear boiler cover
– If no adapter for the fl ue gas blower (accessories) is being used. break off the cut-out on the rear boiler cover – Fig. 77.
Large cut-out = exhaust pipe insulated
Small cut-out = exhaust pipe not insulated
Do not break off = adapter for flue connection installed
– Put on the rear boiler cover – Fig. 78.
Fig. 77 If no adapter for the fl ue connection
is being used. break off the cut-out
Fig. 78 Putting on the rear boiler cover
Fig. 79 Installing the hanger
3
4
5
6
1 2