
21
2.
For the installer
2.3.11 Installing the side panels and insulation
– Screw in 2 M5x10 self-threading TT screws
halfway
on each side of the base (Fig. 34) and depending on which side
the door catch is to be located. install the lower door hinge for attaching the cladding door on either the left or on
the right with 2 M5x10 self-threading TT screws – Fig. 34.
Fig. 34 Screwing in 2 screws on each side of the base. installing the cladding door hinge
2 each of
2 x
Fig. 35 Installing insulation
M5x10 TT
M5x10 TT
– Insert insulation on the left and right side of the boiler. as well as on the top – Fig. 35.