
32
2.
For the installer
2.3.24 Door safety switch
– Route the cable from the door safety switch into the control panel and connect at X15 – Fig. 72.
Fig. 72 Routing the cable from the door
safety switch and connecting at X15
2.3.25 Installing function modules (MES INFINITY control system)
The function modules (MES INFINITY control system) can:
– Be installed on a wall (Fig. 73) or
– Be installed on the control panel in the boiler – Fig. 74.
For installation and connection. see Section 3.2.
Fig. 73 Function modules (MES INFINITY
control system) installed on the wall
Fig. 74 Function modules (MES INFINITY
control system) installed on the con-
trol panel in the boiler
2.3.26 Installing the front boiler cover
– Hook in the front boiler cover (Fig. 75) and attach at the rear with 2 self-tapping screws – Fig. 76.
Fig. 75 Hooking in the boiler cover
Fig. 76 Securing boiler cover in 2 places
2 x