
2
Table of contents
Table of contents
1. Important information ................................................................................................. 4
1.1 Safety precautions ......................................................................................................................... 4
1.1.1 Caution symbols .........................................................................................................................................................4
1.1.2 General safety information .........................................................................................................................................4
1.2 Flue .............................................................................................................................................. 5
1.3 Boiler room/installation room ......................................................................................................... 5
1.4 Initial start-up and operating instructions ....................................................................................... 6
1.5 Disposal/recycling ......................................................................................................................... 6
2. For the installer ...........................................................................................................7
2.1 Scope of supply. packaging ............................................................................................................. 7
2.2 System .......................................................................................................................................... 7
2.2.1 Area of use ..................................................................................................................................................................7
2.2.2 Standards ...................................................................................................................................................................7
2.2.3 Heat accumulator (buffer) ..........................................................................................................................................8
2.2.4 Heating circuits ..........................................................................................................................................................8
2.2.5 Circulation pump ........................................................................................................................................................9
2.2.6 Heating water .............................................................................................................................................................9
2.2.7 Domestic water (bringing the hot water tank up to temperature in summer) ............................................................9
2.2.8 Combination with automatic boiler (e.g. pellet or oil-fired boiler) ............................................................................9
2.2.9 Water-side resistance (pressure loss) ......................................................................................................................10
2.2.10 Combustion air .........................................................................................................................................................10
2.3 Installation sequence ....................................................................................................................11
2.3.1 Parts designations for installation ........................................................................................................................... 11
2.3.2 Taking into the building and installing ..................................................................................................................... 12
2.3.3 Minimum clearances for fire protection. cleaning and maintenance ....................................................................... 12
2.3.4 Prior to installation ..................................................................................................................................................14
2.3.5 Installing the flue connection adapter .....................................................................................................................14
2.3.6 Converting the door catch from left to right ............................................................................................................16
2.3.7 Installing the door handles ......................................................................................................................................18
2.3.8 Installing the flue gas blower. air control and lambda sensor .................................................................................19
2.3.9 Installing the lighting door with automatic ignition ................................................................................................19
2.3.10 Installing the control panel with carburisation gas duct .........................................................................................20
2.3.11 Installing the side panels and insulation ................................................................................................................. 21
2.3.12 Installing the control panel ...................................................................................................................................... 22
2.3.13 Installing the thermocontrol sensor .........................................................................................................................25
2.3.14 Installing the thermocontrol sensor cover ...............................................................................................................25
2.3.15 Installing the cable channels. routing the blower motor cable and installing the sensor ........................................26
2.3.16 Installing insulation for the rear panel ....................................................................................................................28
2.3.17 Installing the rear panels .........................................................................................................................................28
2.3.18 Installing the blower housing on the adapter ..........................................................................................................29
2.3.19 Installing the lever for cleaning heating surfaces ....................................................................................................29
2.3.20 Installing the cladding door .................................................................................................................................... 30
2.3.21 LON cable from control panel to operating panel .................................................................................................... 31
2.3.22 Installing the InfoWIN Touch.................................................................................................................................... 31