background image

TRANSPORTATION AND STORAGE English

Installation and operating instructions Wilo-EMUport CORE 39

Max. reservoir flooding:
CORE 20.2:

5 m for max. 3 h

CORE 45.2:

6,7 m for max. 3 h

CORE 50.2:

6,7 m for max. 3 h

CORE 60.2:

6,7 m for max. 3 h

Fluid temperature [t]:

+3...+40 °C

Ambient temperature:

+3...+40 °C

Motor data

Mains connection [U/f]:

3~400 V/50 Hz

Power consumption [P

1

]:

See rating plate

Rated power [P

2

]:

See rating plate

Rated current [I

N

]:

See rating plate

Speed [n]:

See rating plate

Activation type [AT]:

See rating plate

System protection class:

IP68

Insulation class [Cl.]:

H

Max. switching operations/h:

30

Cable length:

10 m

Operating mode:

See rating plate

Connections

Pressure connection:

CORE 20.2:

Version A: Ø 90 mm

 

Version B: DN 80

CORE 45.2:

Version A: Ø 100 mm

 

Version B: DN 100

CORE 50.2:

Version A: Ø 100 mm

 

Version B: DN 100

CORE 60.2:

Version A: Ø 100 mm

 

Version B: DN 100

Inlet connection:

DN 200, PN 10

Ventilation connection:

DN 70

Dimensions and weights

Gross volume:
CORE 20.2:

440 l

CORE 45.2:

1200 l

CORE 50.2:

1200 l

CORE 60.2:

1200 l

Switching volume:
CORE 20.2:

295 l

CORE 45.2:

900 l

CORE 50.2:

900 l

CORE 60.2:

900 l

Sound-pressure level*:

< 80 dB(A)

Weight:

See rating plate

* The sound-pressure level depends on the 
duty point and may vary. Incorrect installation 
or impermissible operation can increase the 
sound-pressure level.

3.7.  Type key

Example: Wilo-EMUport CORE 20.2-10A

CORE

Standardised sewage lifting unit with solids 
separation system

20

Max. inlet in m³/h

2

Number of pumps

10

Maximum delivery head in m at Q = 0

A

Version:

A = standard version
B = comfort version

3.8.  Scope of delivery

• Sewage lifting unit ready for connection with 

10 m cable and bare cable ends

• Installation and operating instructions

3.9. 

Accessories (optionally available)

• 

On pressure side:

• Flange connectors for connecting the discharge 

pipe to the pressure connection without flange 

connectors

• 

On intake side:

• FFRe piece of pipe for connecting different 

inlet pipes

• Gate valve
• Inlet sets comprising FFRe piece of pipe and 

gate valve

• Flow meter set
• Flange connectors for connecting pipes with-

out flange connector

• 

General:

• SC-L...-FTS switchgear
• 

Horn 230 V, 50 Hz

• 

Flash light 230 V, 50 Hz

• 

Signal lamp 230 V, 50 Hz

4.  Transportation and storage

DANGER due to toxic substances! 

Lifting units that pump fluids that are harmful 

to health must be decontaminated before any 

other work is performed! Otherwise there is 

a risk of death! Wear the necessary physical 

protection equipment!

4.1.  Delivery

On delivery, check immediately that the shipment 
is complete and undamaged. If any parts are 
damaged or missing, the transport company or 

the manufacturer must be notified on the day of 

delivery since claims made after this date cannot 
be recognised. Damage to parts must be noted on 
the delivery or freight documentation.

4.2.  Transport

Only the designated and approved fastening 
devices, transportation and lifting equipment 
may be used for transportation. It must have a 

sufficient bearing capacity and safe working load 

in order for the lifting unit to be transported safe-

Содержание EMUport CORE

Страница 1: ...ncionamiento no Monterings og driftsveiledning sv Monterings och sk tselanvisning fi Asennus ja k ytt ohje hr Upute za ugradnju i uporabu sr Uputstvo za ugradnju i upotrebu sl Navodila za vgradnjo in...

Страница 2: ...Fig 1 EMUport CORE A Fig 1 EMUport CORE B 1 5 3 3 3 7 7 6 2 8 8 8 9 9 10 10 1 4 4 1 5 3 3 3 7 7 6 2 8 8 8 9 9 10 10 11 11 1 4 4...

Страница 3: ...Fig 2 Fig 3 1 1 1 2 2 2 2 2 1...

Страница 4: ...Fig 6 A CORE A Motor P 13 Fig 5 Fig 4 2 1 1 5 1 2 4 3 M 3 gn ye W V 21 20 U PE 6 DK...

Страница 5: ...E A Motor P 17 5 1 2 4 3 M 3 gn ye W V 20 21 22 U PE 6 3 4 5 2 1 M 3 gn ye W1W2 V1 20 21 22 U1 V2 U2 PE 6 8 7 9 Fig 7 A CORE B Motor P 13 Fig 6 D CORE A Motor FK 17 1 5 1 2 4 3 M 3 gn ye W V 21 20 U P...

Страница 6: ...Motor P 17 Fig 7 D CORE B Motor FK 17 1 3 4 5 2 1 M 3 gn ye W1W2 V1 20 21 22 U1 V2 U2 PE 6 8 7 9 DK M 3 gn ye W V 21 20 U PE DK DK Fig 8 1 2 2 1 Fig 7 B CORE B Motor P 17 5 1 2 4 3 M 3 gn ye W V 20 2...

Страница 7: ...Fig 12 Fig 11 Fig 10 3 3 2 1 4 3 1 2 4 2 1 3 5 Fig 9 3 1 2...

Страница 8: ...Fig 13 Motor P 13 P 17 Fig 13 Motor FK 17 1 Fig 13 Motor FK 17 1 D M D...

Страница 9: ...39 3 8 Scope of delivery 39 3 9 Accessories optionally available 39 4 Transportation and storage 39 4 1 Delivery 39 4 2 Transport 39 4 3 Storage 40 4 4 Return delivery 40 5 Installation 40 5 1 Genera...

Страница 10: ...tems and or com ponents This operation and maintenance manual refers to the lifting unit indicated on the title page 1 5 Warranty In general the specifications in the current Gen eral Terms and Condit...

Страница 11: ...stallation The lifting unit must be disconnected from the electricity network and secured against reactivation All rotating parts must have come to a standstill The operator must report any faults or...

Страница 12: ...ed or if they do not work 2 5 Conduct during operation When operating the lifting unit always follow the locally applicable laws and regulations for work safety accident prevention and handling electr...

Страница 13: ...n compliant with the intended use 3 1 1 Application limits DANGER due to overpressure Exceeding the application limits can result in excessive pressure in the collection reservoir in the event of syst...

Страница 14: ...upstream of the discharge ports of the sewage pumps and filter out non permitted large solid materials This way only pre cleaned sewage passes through the idle sewage pump into the shared collection r...

Страница 15: ...ion system 20 Max inlet in m h 2 Number of pumps 10 Maximum delivery head in m at Q 0 A Version A standard version B comfort version 3 8 Scope of delivery Sewage lifting unit ready for connection with...

Страница 16: ...l result in damage to these components and the lifting unit Never immerse the electrical compo nents in a liquid and protect them against the ingress of moisture The lifting unit must be protected fro...

Страница 17: ...this will be required for installing dismantling the lifting unit The lifting equipment must be able to reach the place where the lifting unit is used and placed without danger The set down location...

Страница 18: ...he pressure pipe must be connected so it is free from vibration noise insulated and flexible The connection as well as all unions must be absolutely leak tight The routing of the pressure pipe must be...

Страница 19: ...are present in the working area during operations then a guard must be installed 5 4 Electrical connection POTENTIALLY fatal danger due to electrical voltage Incorrect electrical connections can caus...

Страница 20: ...could lead to fatal injury due to explosion The connection of the level sensor must be made using an intrinsically safe electric circuit e g Zener barrier Observe in this connection local stat utory...

Страница 21: ...cking the installation Check the installation to ensure all the necessary work was carried out properly Fastening Floor fixation carried out properly Mechanical connections All of the connections are...

Страница 22: ...unit operates in automatic mode by default and is switched on and off using the inte grated level control device 1 Switching on the system via the switchgear Main switch to ON 2 Check the switchgear s...

Страница 23: ...ances During removal there is potential for contact with fluids that represent a health hazard The following points must be observed without fail Wear appropriate full body protection as well as prote...

Страница 24: ...After maintenance or repair work the lifting unit must be put back in operation in accordance with the Commissioning chapter Note the following All maintenance and repair work must be carried out by W...

Страница 25: ...loyee and the end user NOTE We recommend concluding a maintenance contract for regular maintenance work Please contact Wilo customer service for more infor mation about this 8 4 1 Maintenance interval...

Страница 26: ...aning the solids separation reservoir 1 Sewage pump 2 Screwed connection at the discharge port of the sew age pump 3 Pump inlet including screen holder 4 Solids separation reservoir 5 Pump inlet solid...

Страница 27: ...3 Delivery head too small 1 2 3 4 5 8 11 12 13 Lifting unit runs roughly loud noise 1 2 3 9 12 13 14 9 2 Overview of possible causes and their remedies 1 Inlet or impeller clogged Remove deposits from...

Страница 28: ...V06 DIN A4 10 Appendix 10 1 Spare parts Spare parts can be ordered from Wilo customer service To avoid return queries and incorrect or ders the serial and or article number must always be supplied Sub...

Страница 29: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Отзывы: