background image

PRODUCT DESCRIPTION English

Installation and operating instructions Wilo-EMUport CORE 37

3.  Product description

The lifting unit has been manufactured with great 
care and is subject to constant quality controls. 
Trouble-free operation is guaranteed if the device 
is installed and maintained correctly.

3.1. 

Intended use and fields of application

DANGER of explosion! 

Gas can collect in the collection reservoir 

during pumping of sewage containing faeces. 

This can ignite and lead to an explosion as a 

result of incorrect installation and operation.

•  The collection reservoir must be undamaged 

(no cracks, leaks, porous material)!

•  The inlet and outlet as well as the vent must 

be connected in accordance with the regula-

tions and be absolutely leak-tight! 

DANGER 

– explosive fluids!

 

It is strictly prohibited to pump explosive flu

-

ids (gasoline, kerosene etc.). The lifting units 

are not designed for these fluids!

Pumping of untreated sewage that cannot be 
returned to the sewer system using natural falls, 
and for the draining of objects that are below 

the backflow level (according to DIN EN 12056/
DIN 1986-100).

The lifting unit 

must not

 be used for pumping

• Debris, ash, garbage, glass, sand, plaster, cement, 

lime, mortar, fibrous materials, textiles, paper 
towels, wet-wipes (e.g. fleece cloths, moist toilet 

paper wipes), nappies, cardboard, coarse paper, 
synthetic resins, tar, kitchen waste, grease, oil

• Slaughterhouse waste, disposal of slaughtered 

animals and animal waste (liquid manure, etc.)

• Toxic, aggressive and corrosive substances, such 

as heavy metals, biocides, pesticides, acids, bases, 
salts, swimming-pool water

• Cleaning agents, disinfectants, dishwashing or 

laundry detergents in excess amounts, and such 
which have a high degree of foam formation

• Sewage from drainage objects that are located 

above the backflow level and can be drained by 
natural fall (in accordance with EN 12056-1)

• Explosive media
• Drinking water

The system must be installed in accordance with 

the general rules as detailed in EN 12056 and 
DIN 1986-100.

Intended use includes compliance with this man-
ual. Any other use is regarded as non-compliant 
with the intended use.

3.1.1.  Application limits

DANGER due to overpressure 

Exceeding the application limits can result in 

excessive pressure in the collection reservoir 

in the event of system malfunction. This can 

cause the collection reservoir to burst! There 

is a health risk due to contact with sewage 

polluted by bacteria (faeces). Always comply 

with the application limits and ensure that the 

inlet is blocked if the system malfunctions.

The following application limits must be observed 

strictly:

• 

Max. inlet:

• 

CORE 20.2: 20 m³/h

• 

CORE 45.2: 45 m³/h

• 

CORE 50.2: 50 m³/h

• 

CORE 60.2: 60 m³/h

• 

Max. reservoir flooding:

• 

CORE 20.2: 5 m for max. 3 h

• 

CORE 45.2, 50.2, 60.2: 6,7 m for max. 3 h

• Max. permitted pressure in the system pressure 

pipe: 6 bar

• 

Max. fluid temperature: 40 °C

• 

Max. ambient temperature: 40 °C

3.2.  Set-up

The Wilo-EMUport CORE is a submersible and 
fully automatically operating sewage lifting unit 
with solids separation system and two sub-
mersible sewage pumps in alternating operation 
without peak-load operation.

Fig. 1: 

Description 

1

Collection reservoir

2

Collection reservoir inspection opening

3

Solids separation reservoir

4

Solids separation reservoir block

5

Inlet

6

Supply box/distributor

7

Pressure connection

8

Block for pressure pipe

9

Sewage pump

10 Non-return valve
11 Automatic backwashing (Variant B only)

3.2.1.  Solids separation system

Solids separation system with all-in-one gastight 
and watertight collection reservoir without con-
structive welded joints, as well as two separately 
blockable solids separation reservoirs.
The collection reservoir has rounded edges, the 
tank bottom is bevelled, the deepest point is 
located directly below the pump. This prevents 
deposits and the drying of solids at critical points.

With pre-filtering in the solids separation reser

-

voirs, the solids are filtered from the fluid and only 
pre-filtered sewage is directed to the collection 

reservoir.

3.2.2.  Sewage pumps

Pumping is performed by two high-performance 
submersible sewage pumps in dry well instal-
lation. The pumps are designed as a redundant 
system and run in alternating operation.

Simultaneous operation of the two pumps is 

strictly forbidden!

3.2.3.  Level control

The level control is controlled by a level sensor. 
Measurement range is documented on the rating 
plate.

Содержание EMUport CORE

Страница 1: ...ncionamiento no Monterings og driftsveiledning sv Monterings och sk tselanvisning fi Asennus ja k ytt ohje hr Upute za ugradnju i uporabu sr Uputstvo za ugradnju i upotrebu sl Navodila za vgradnjo in...

Страница 2: ...Fig 1 EMUport CORE A Fig 1 EMUport CORE B 1 5 3 3 3 7 7 6 2 8 8 8 9 9 10 10 1 4 4 1 5 3 3 3 7 7 6 2 8 8 8 9 9 10 10 11 11 1 4 4...

Страница 3: ...Fig 2 Fig 3 1 1 1 2 2 2 2 2 1...

Страница 4: ...Fig 6 A CORE A Motor P 13 Fig 5 Fig 4 2 1 1 5 1 2 4 3 M 3 gn ye W V 21 20 U PE 6 DK...

Страница 5: ...E A Motor P 17 5 1 2 4 3 M 3 gn ye W V 20 21 22 U PE 6 3 4 5 2 1 M 3 gn ye W1W2 V1 20 21 22 U1 V2 U2 PE 6 8 7 9 Fig 7 A CORE B Motor P 13 Fig 6 D CORE A Motor FK 17 1 5 1 2 4 3 M 3 gn ye W V 21 20 U P...

Страница 6: ...Motor P 17 Fig 7 D CORE B Motor FK 17 1 3 4 5 2 1 M 3 gn ye W1W2 V1 20 21 22 U1 V2 U2 PE 6 8 7 9 DK M 3 gn ye W V 21 20 U PE DK DK Fig 8 1 2 2 1 Fig 7 B CORE B Motor P 17 5 1 2 4 3 M 3 gn ye W V 20 2...

Страница 7: ...Fig 12 Fig 11 Fig 10 3 3 2 1 4 3 1 2 4 2 1 3 5 Fig 9 3 1 2...

Страница 8: ...Fig 13 Motor P 13 P 17 Fig 13 Motor FK 17 1 Fig 13 Motor FK 17 1 D M D...

Страница 9: ...39 3 8 Scope of delivery 39 3 9 Accessories optionally available 39 4 Transportation and storage 39 4 1 Delivery 39 4 2 Transport 39 4 3 Storage 40 4 4 Return delivery 40 5 Installation 40 5 1 Genera...

Страница 10: ...tems and or com ponents This operation and maintenance manual refers to the lifting unit indicated on the title page 1 5 Warranty In general the specifications in the current Gen eral Terms and Condit...

Страница 11: ...stallation The lifting unit must be disconnected from the electricity network and secured against reactivation All rotating parts must have come to a standstill The operator must report any faults or...

Страница 12: ...ed or if they do not work 2 5 Conduct during operation When operating the lifting unit always follow the locally applicable laws and regulations for work safety accident prevention and handling electr...

Страница 13: ...n compliant with the intended use 3 1 1 Application limits DANGER due to overpressure Exceeding the application limits can result in excessive pressure in the collection reservoir in the event of syst...

Страница 14: ...upstream of the discharge ports of the sewage pumps and filter out non permitted large solid materials This way only pre cleaned sewage passes through the idle sewage pump into the shared collection r...

Страница 15: ...ion system 20 Max inlet in m h 2 Number of pumps 10 Maximum delivery head in m at Q 0 A Version A standard version B comfort version 3 8 Scope of delivery Sewage lifting unit ready for connection with...

Страница 16: ...l result in damage to these components and the lifting unit Never immerse the electrical compo nents in a liquid and protect them against the ingress of moisture The lifting unit must be protected fro...

Страница 17: ...this will be required for installing dismantling the lifting unit The lifting equipment must be able to reach the place where the lifting unit is used and placed without danger The set down location...

Страница 18: ...he pressure pipe must be connected so it is free from vibration noise insulated and flexible The connection as well as all unions must be absolutely leak tight The routing of the pressure pipe must be...

Страница 19: ...are present in the working area during operations then a guard must be installed 5 4 Electrical connection POTENTIALLY fatal danger due to electrical voltage Incorrect electrical connections can caus...

Страница 20: ...could lead to fatal injury due to explosion The connection of the level sensor must be made using an intrinsically safe electric circuit e g Zener barrier Observe in this connection local stat utory...

Страница 21: ...cking the installation Check the installation to ensure all the necessary work was carried out properly Fastening Floor fixation carried out properly Mechanical connections All of the connections are...

Страница 22: ...unit operates in automatic mode by default and is switched on and off using the inte grated level control device 1 Switching on the system via the switchgear Main switch to ON 2 Check the switchgear s...

Страница 23: ...ances During removal there is potential for contact with fluids that represent a health hazard The following points must be observed without fail Wear appropriate full body protection as well as prote...

Страница 24: ...After maintenance or repair work the lifting unit must be put back in operation in accordance with the Commissioning chapter Note the following All maintenance and repair work must be carried out by W...

Страница 25: ...loyee and the end user NOTE We recommend concluding a maintenance contract for regular maintenance work Please contact Wilo customer service for more infor mation about this 8 4 1 Maintenance interval...

Страница 26: ...aning the solids separation reservoir 1 Sewage pump 2 Screwed connection at the discharge port of the sew age pump 3 Pump inlet including screen holder 4 Solids separation reservoir 5 Pump inlet solid...

Страница 27: ...3 Delivery head too small 1 2 3 4 5 8 11 12 13 Lifting unit runs roughly loud noise 1 2 3 9 12 13 14 9 2 Overview of possible causes and their remedies 1 Inlet or impeller clogged Remove deposits from...

Страница 28: ...V06 DIN A4 10 Appendix 10 1 Spare parts Spare parts can be ordered from Wilo customer service To avoid return queries and incorrect or ders the serial and or article number must always be supplied Sub...

Страница 29: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Отзывы: