background image

English

 

SAFETY

36 

WILO SE 11-2016 V06 DIN A4

BEWARE of moisture! 

Ingress of moisture into the cable will result in 

damage to the cable and the lifting unit. Nev-

er immerse the cable end in fluid and always 

protect it from moisture. Unused wires must 

be insulated!

The lifting units are operated with three-phase 
current. The governing national directives, stand-
ards and regulations (e.g. VDE 0100) as well as the 
requirements of the local energy supply company 
must be observed.
The control must be via a switchgear to be pro-
vided by the customer. The person operating the 
lifting unit must know where it is supplied with 
power and how to cut off the supply. A residu-
al-current device (RCD) must be provided.
The section entitled “Electrical connection” must 
be observed when connecting the product. The 

technical specifications must be observed strictly! 

Lifting units must always be grounded.

If the lifting unit has been switched off by a 

protective device, it must not be switched on 

again until the fault has been corrected.

When connecting the lifting unit to the local 
power supply, always comply with the national 
regulations concerning electromagnetic compat-
ibility (EMC).

Connections may be made only if the connec-

tion meets the harmonised EU standards. Mo-

bile radio equipment may cause malfunctions in 

the system.

BEWARE of electromagnetic radiation! 

Electromagnetic radiation can pose a fatal 

risk for people with cardiac pacemakers. Put 

up appropriate signs and make sure anyone 

affected is aware of the danger!

2.4.  Safety and monitoring equipment

The sewage lifting unit is equipped with the fol-

lowing safety and monitoring devices:

• Safety device

• 

Overflow

• Monitoring devices

• Thermal motor monitoring
• Leakage detection for motor compartment

The monitoring devices must be connected in a 
corresponding switchgear.
Personnel must be informed about the installed 
systems and how they work.

CAUTION! 

Never operate the lifting unit if the safety 

and monitoring devices have been removed or 

damaged, or if they do not work!

2.5.  Conduct during operation

When operating the lifting unit, always follow the 
locally applicable laws and regulations for work 

safety, accident prevention and handling electri-
cal machinery.
The motor housing of the sewage pump can reach 

temperatures of up to 100°C during operation. 
A corresponding safety zone must be defined by 

the end-user. No personnel are permitted in this 

safety zone during operation and no readily flam

-

mable and combustible objects may be stored 
there.

The safety zone must be marked in a way that is 

unambiguous and clearly recognisable!

BEWARE of burns! 

The motor housing can reach temperatures of 

up to 100°C during operation. There is a risk 

of burns! If personnel are present in the safety 

zone during operations, then a guard must be 

installed.

To help ensure safe working practice, the respon-

sibilities of employees should be clearly specified 

by the operator. All personnel are responsible for 
ensuring that regulations are observed.

2.6.  Fluids

The lifting unit chiefly collects and pumps sewage 

containing faeces. As a result, changing to a dif-

ferent fluid is not possible.

Use in drinking water is not permitted!

2.7.  Sound-pressure

Lifting units generate a sound-pressure level of 

approx. 70 dB(A) during operation.

The sound-pressure level may also be higher 
during operation depending on several factors 
(such as installation, attachment of accessories 
and piping, duty point, etc.).
Therefore, we recommend that the end-user 
should take an additional measurement at the 
workplace once the lifting unit is running at its 
duty point and under all operating conditions.

CAUTION: Wear ear defenders! 

According to applicable laws and regula-

tions, ear protection must be worn if the 

sound-pressure level is 85 dB (A) or more! The 

end-user must make sure that this is complied 

with!

2.8.  Standards and guidelines used

The lifting unit is subject to various European 
directives and harmonised standards. Refer to the 

EC Declaration of conformity for precise informa

-

tion about these.
In addition, various standards are used as a basis 
for operating, assembling and dismantling the 
lifting unit.

2.9. 

CE marking

The CE marking is attached to the rating plate.

Содержание EMUport CORE

Страница 1: ...ncionamiento no Monterings og driftsveiledning sv Monterings och sk tselanvisning fi Asennus ja k ytt ohje hr Upute za ugradnju i uporabu sr Uputstvo za ugradnju i upotrebu sl Navodila za vgradnjo in...

Страница 2: ...Fig 1 EMUport CORE A Fig 1 EMUport CORE B 1 5 3 3 3 7 7 6 2 8 8 8 9 9 10 10 1 4 4 1 5 3 3 3 7 7 6 2 8 8 8 9 9 10 10 11 11 1 4 4...

Страница 3: ...Fig 2 Fig 3 1 1 1 2 2 2 2 2 1...

Страница 4: ...Fig 6 A CORE A Motor P 13 Fig 5 Fig 4 2 1 1 5 1 2 4 3 M 3 gn ye W V 21 20 U PE 6 DK...

Страница 5: ...E A Motor P 17 5 1 2 4 3 M 3 gn ye W V 20 21 22 U PE 6 3 4 5 2 1 M 3 gn ye W1W2 V1 20 21 22 U1 V2 U2 PE 6 8 7 9 Fig 7 A CORE B Motor P 13 Fig 6 D CORE A Motor FK 17 1 5 1 2 4 3 M 3 gn ye W V 21 20 U P...

Страница 6: ...Motor P 17 Fig 7 D CORE B Motor FK 17 1 3 4 5 2 1 M 3 gn ye W1W2 V1 20 21 22 U1 V2 U2 PE 6 8 7 9 DK M 3 gn ye W V 21 20 U PE DK DK Fig 8 1 2 2 1 Fig 7 B CORE B Motor P 17 5 1 2 4 3 M 3 gn ye W V 20 2...

Страница 7: ...Fig 12 Fig 11 Fig 10 3 3 2 1 4 3 1 2 4 2 1 3 5 Fig 9 3 1 2...

Страница 8: ...Fig 13 Motor P 13 P 17 Fig 13 Motor FK 17 1 Fig 13 Motor FK 17 1 D M D...

Страница 9: ...39 3 8 Scope of delivery 39 3 9 Accessories optionally available 39 4 Transportation and storage 39 4 1 Delivery 39 4 2 Transport 39 4 3 Storage 40 4 4 Return delivery 40 5 Installation 40 5 1 Genera...

Страница 10: ...tems and or com ponents This operation and maintenance manual refers to the lifting unit indicated on the title page 1 5 Warranty In general the specifications in the current Gen eral Terms and Condit...

Страница 11: ...stallation The lifting unit must be disconnected from the electricity network and secured against reactivation All rotating parts must have come to a standstill The operator must report any faults or...

Страница 12: ...ed or if they do not work 2 5 Conduct during operation When operating the lifting unit always follow the locally applicable laws and regulations for work safety accident prevention and handling electr...

Страница 13: ...n compliant with the intended use 3 1 1 Application limits DANGER due to overpressure Exceeding the application limits can result in excessive pressure in the collection reservoir in the event of syst...

Страница 14: ...upstream of the discharge ports of the sewage pumps and filter out non permitted large solid materials This way only pre cleaned sewage passes through the idle sewage pump into the shared collection r...

Страница 15: ...ion system 20 Max inlet in m h 2 Number of pumps 10 Maximum delivery head in m at Q 0 A Version A standard version B comfort version 3 8 Scope of delivery Sewage lifting unit ready for connection with...

Страница 16: ...l result in damage to these components and the lifting unit Never immerse the electrical compo nents in a liquid and protect them against the ingress of moisture The lifting unit must be protected fro...

Страница 17: ...this will be required for installing dismantling the lifting unit The lifting equipment must be able to reach the place where the lifting unit is used and placed without danger The set down location...

Страница 18: ...he pressure pipe must be connected so it is free from vibration noise insulated and flexible The connection as well as all unions must be absolutely leak tight The routing of the pressure pipe must be...

Страница 19: ...are present in the working area during operations then a guard must be installed 5 4 Electrical connection POTENTIALLY fatal danger due to electrical voltage Incorrect electrical connections can caus...

Страница 20: ...could lead to fatal injury due to explosion The connection of the level sensor must be made using an intrinsically safe electric circuit e g Zener barrier Observe in this connection local stat utory...

Страница 21: ...cking the installation Check the installation to ensure all the necessary work was carried out properly Fastening Floor fixation carried out properly Mechanical connections All of the connections are...

Страница 22: ...unit operates in automatic mode by default and is switched on and off using the inte grated level control device 1 Switching on the system via the switchgear Main switch to ON 2 Check the switchgear s...

Страница 23: ...ances During removal there is potential for contact with fluids that represent a health hazard The following points must be observed without fail Wear appropriate full body protection as well as prote...

Страница 24: ...After maintenance or repair work the lifting unit must be put back in operation in accordance with the Commissioning chapter Note the following All maintenance and repair work must be carried out by W...

Страница 25: ...loyee and the end user NOTE We recommend concluding a maintenance contract for regular maintenance work Please contact Wilo customer service for more infor mation about this 8 4 1 Maintenance interval...

Страница 26: ...aning the solids separation reservoir 1 Sewage pump 2 Screwed connection at the discharge port of the sew age pump 3 Pump inlet including screen holder 4 Solids separation reservoir 5 Pump inlet solid...

Страница 27: ...3 Delivery head too small 1 2 3 4 5 8 11 12 13 Lifting unit runs roughly loud noise 1 2 3 9 12 13 14 9 2 Overview of possible causes and their remedies 1 Inlet or impeller clogged Remove deposits from...

Страница 28: ...V06 DIN A4 10 Appendix 10 1 Spare parts Spare parts can be ordered from Wilo customer service To avoid return queries and incorrect or ders the serial and or article number must always be supplied Sub...

Страница 29: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...