First Time Power-Up and Start-Up
fans at the electronics, only at the heatsinks. At the factory default the fans stay on for a while during
the energization and then they are switched off. They will only be switched on again if the heatsink
temperature reaches 70 °C (158 ºF), and off if the temperature drops below 60 °C (140 ºF).
14. Observe the existence of faults/alarms. In case that a fault or alarm occurs, verify the possible causes
and solve the problem.
15. Enable the converter PWM pulses via DI. Verify the input current of each power unit phase by programming
the password 637 at the parameter P0000 (refer to the item 5.2.1), which makes the visualization of the
parameters from P0815 to P0829 possible.
16. Verify if the DC link voltage at P0004 presents a value close to P0151.
17. Disable the converter.
18. Verify if the temperature reading parameters of the installed power units, P0800 to P0814 according to
the case, indicate values close to the ambient temperature.
19. Follow the start-up routine of the output inverter according to the instructions described at the specific
manual.
20. Deenergize the drive and wait until the complete discharge of the DC link capacitors. Then connect a motor
with power close to 100 HP (75 kW) or the application motor with no load. Verify the motor connection
and if its current and voltage match with the inverter. If the motor of the application is going to be used,
decouple it mechanically from the load. If the motor cannot be decoupled, make sure that the rotation
in any direction (clockwise or counterclockwise) will not cause damage to the machine or accident risks.
21. Command the drive, perform the DC link pre-charge and close the main contactor.
22. Enable the converter PWM pulses. Verify the input current of each CFW-11M RB power unit phase: the
current unbalance (P0815 to P0829) must be at most 10 %, considering that the maximum current of
the power units is respected individually.
5.2 START-UP
The start-up procedure is described in three simple steps by using the existing parameter groups,
Oriented
Start-up
routine and the
Basic Application
group.
Steps:
(1)
Set the password for parameter modification.
(2)
Execute the
Oriented Start-up
routine.
(3)
Set the parameters of the
Basic Application
group.