Procedure
6. Press tube onto cone until it reaches back face (it may be necessary to widen end of tube). As
illustrated in the images below.
Procedure
7. Whilst continuing to hold the tube against back face of cone, slide compression ring and connection
collar back down tube on top of pumphead head port seal and tighten onto the pump head. As
illustrated in the images below.
Procedure
8. Repeat procedure for other connector.
9. Check for leaks and tighten connection collar further if necessary.
12 INSTALLATION: PART 3 (FLUID PATH)
82
Содержание qdos 20
Страница 40: ...6 Storage 6 1 Storage conditions 41 6 2 Shelf life 41 6 STORAGE 40...
Страница 169: ...Procedure 9 NEXT 10 Use keys to set Alert Level Procedure 11 SELECT to return to FLUID LEVEL SETTINGS 16 OPERATION 169...
Страница 192: ...NOTICE The pumphead locking lever is designed to be loosened or tightened by hand 17 MAINTENANCE 192...