Country
Cable specification
Plug specification
EU cable/plug (Part numbers
ending in E)
2950 mm length. 3 core, yellow/green,
brown, blue.
EN 50525-2-21.
16 A, 250 V AC. CEE (7) VII,
IEC60884.
Swiss plug (Part numbers ending
in C)
2950 mm length. 3 core, yellow/green,
brown, blue.
ÖVE K40a, HD22.
10 A, 250 V AC. SEV 1011:2009,
chapter SEV 6534/2.
Brazil plug (Part numbers ending
in B)
2950 mm length. 3 core, yellow/green,
brown, blue.
ÖVE K41a, EN50525, IEC 60227.
10 A, 250 V AC. IRAM 2073.
11.2.5 Pre-electrical installation requirement checklist
Carry out the following pre-electrical installation check. At this point in the full installation procedure, the fluid
path or pumphead should not yet be installed.
l
Ensure then pump has been physically installed in accordance with
"10 Installation: Part 1 (Physical)" on
l
Ensure the power cable is not damaged
l
Ensure that the supplied AC power plug is correct for your Country/Region/Facility.
l
Ensure electrical isolation device if fitted and working
If there is a problem with any of the above do not carry on with the electrical installation and instruct that the
pump is removed from service, until the pre-electrical installation requirements have been met.
11.2.6 Connect to AC Power supply
l
Carry out the pre installation checks in the previous procedure
l
Connect to AC power supply via the supplied AC power plug.
Do not apply mains power voltages to any of the control input terminals. The 5-24V voltage range must not be
exceeded.
11 INSTALLATION: PART 2 (ELECTRICAL POWER)
58
Содержание qdos 20
Страница 40: ...6 Storage 6 1 Storage conditions 41 6 2 Shelf life 41 6 STORAGE 40...
Страница 169: ...Procedure 9 NEXT 10 Use keys to set Alert Level Procedure 11 SELECT to return to FLUID LEVEL SETTINGS 16 OPERATION 169...
Страница 192: ...NOTICE The pumphead locking lever is designed to be loosened or tightened by hand 17 MAINTENANCE 192...