12.2 Pre-Fluid path installation requirement checklist
Carry out the following pre-fluid path installation check.
l
Ensure then pump has been physically installed in accordance with
"10 Installation: Part 1 (Physical)" on
l
Ensure then pump has been electrically installed in accordance with
"11 Installation: Part 2 (Electrical
l
Ensure a overpressure safety device, non-return valves, isolation valves, drain valves, and
inlet
/
discharge
pipework have been installed and tested in the system in accordance with
path system requirements" on page 63
. Do not fit valve on drain port of pumphead.
If there is a problem with any of the above do not carry on with the fluid path installation and instruct that the
pump is removed from service, until the pre-fluid path installation requirements have been met.
12.3 Installing the pumphead for the first time
The first time installation procedure differs from the replacement pumphead procedure provided in
. In addition the first time installation procedure of the pumphead depends on qdos
model:
Follow the correct procedure based on pump model and time of installation.
12 INSTALLATION: PART 3 (FLUID PATH)
65
Содержание qdos 20
Страница 40: ...6 Storage 6 1 Storage conditions 41 6 2 Shelf life 41 6 STORAGE 40...
Страница 169: ...Procedure 9 NEXT 10 Use keys to set Alert Level Procedure 11 SELECT to return to FLUID LEVEL SETTINGS 16 OPERATION 169...
Страница 192: ...NOTICE The pumphead locking lever is designed to be loosened or tightened by hand 17 MAINTENANCE 192...