CONTENTS
1
KEY INFORMATION
1
1.1
The Clean Air Act 1993 and Smoke Control Areas
4
2
USER INSTRUCTIONS
5
2.1
Filling the Pellet Hopper
5
2.2
System Pressure
6
2.3
System Filling
6
2.4
User Control Interface
6
2.4.1
Home Screen Icons and their meaning.
7
2.4.2
Using the Main Menu
8
3
INSTALLATION REQUIREMENTS
16
3.1
General Requirements
16
3.1.1
Hearth
16
3.1.2
Service Access
16
3.1.3
Heating System
16
3.1.4
Air Vents
17
3.1.5
Drain Cock
17
3.1.6
Pipework
17
3.1.7
Heating System Design
17
3.2
Sealed Systems
17
3.2.1
Expansion Vessel
17
3.2.2
System Filling
18
3.2.3
System Pressure
18
3.2.4
Pressure Relief Valve
18
3.2.5
Low Pressure Switch
18
3.2.6
Condensate Trap
18
3.3
Plumbing layout
20
3.4
Wiring Layout
21
3.5
Flue System
22
4
COMMISSIONING AND SERVICING
25
4.1
Commissioning
25
4.2
Servicing
25
4.2.1
General Requirements
25
4.2.2
Servicing the heat exchanger
26
4.2.3
Emptying the hopper
27
4.2.4
Access for Cleaning the Door Assembly
28
5
YOUR GUARANTEES, TERMS & CONDITIONS
29
Содержание WS18
Страница 4: ...6 APPLIANCE INSTALLATION COMMISSIONING CERTIFICATE REGISTRATION 33 7 APPLIANCE SERVICE RECORDS 35...
Страница 18: ...18 Engineer Figure 20 Flow Chart...
Страница 27: ...27 Figure 30 Flue Assembly...
Страница 28: ...28 4 COMMISSIONING AND SERVICING Figure 31 Flue Outlet Positions for Solid Fuel Appliances...
Страница 39: ...39 INTENTIONALLY LEFT BLANK...