background image

 

Project Name / Date 

 

Division 23 52 33.13 - 1 

 

 
 

DIVISION 23 52 33.13 

 

FINNED WATER-TUBE BOILERS 

PART 1 - GENERAL 

1.1 SUMMARY 

A.  Section includes gas-fired, copper finned-tube hydronic heating boilers 
B. Related 

Sections 

Specifier Note:  Use as needed 

1.  Building Services Piping – Division 23 21 00 
2.  Breeching, Chimneys, and Stacks (Venting) – Division 23 51 00 
3.  HVAC Instrumentation and Controls – Division 23 09 00 
4.  Electrical – Division 23 09 33 

1.2 REFERENCES 

A.  ANSI Z21.13/CSA 4.9 
B.  ASME, BPV Section IV 
C.  2006 UMC, Section 1107.6 
D.  ANSI/ASHRAE 15-1994, Section 8.13.6 
E.  National Fuel Gas Code, ANSI Z223.1/NFPA 54 
F. I=B=R 
G.  National Electrical Code. ANSI/NFPA 70 
H.  ASME CSD-1, 2009 (when required) 

1.3 SUBMITTALS 

A.  Product data sheet (including dimensions, rated capacities, shipping weights, accessories) 
B. Wiring 

diagram 

C. Warranty information 
D.  Installation and operating instructions 

1.4 QUALITY 

ASSURANCE 

A. Regulatory 

Requirements 

1.  ANSI Z21.13/CSA 4.9 
2.  Local and national air quality regulations for low NOx (< 20 PPM NOx emissions) boilers  

B. Certifications 

1. CSA 
2.  ASME H Stamp and National Board Listed 
3. ISO 

9001 

1.5 WARRANTY 

A.  Limited one-year warranty from date of installation  
B.  Limited twenty-year thermal shock warranty 
C.  Limited ten-year closed-system heat exchanger warranty 

PART 2 - PRODUCTS 

2.1 MANUFACTURER 

A. Raypak, 

Inc. 

1.  Contact: 2151 Eastman Ave., Oxnard, CA 93030; Telephone: (805) 278-5300;  

 

Catalog No.:  2000.952D
Effective: 9-1-09
Replaces: 5-1-08

HI DELTA

®

, TYPE H - MODELS 992BE-2342BE 

SUGGESTED SPECIFICATIONS

 

Summary of Contents for 2342BE

Page 1: ... ASME CSD 1 2009 when required 1 3 SUBMITTALS A Product data sheet including dimensions rated capacities shipping weights accessories B Wiring diagram C Warranty information D Installation and operating instructions 1 4 QUALITY ASSURANCE A Regulatory Requirements 1 ANSI Z21 13 CSA 4 9 2 Local and national air quality regulations for low NOx 20 PPM NOx emissions boilers B Certifications 1 CSA 2 ASM...

Page 2: ...be designed to accommodate field changes of either left or right hand plumbing and electrical while leaving the tube bundle in place C Burners 1 The tubular burners shall have multiport radial gas orifices punched ports and slots be capable of quiet ignition and extinction without flashback at the orifice and be manufactured from corrosion resistant titanium stabilized stainless steel with low exp...

Page 3: ... j Air pressure k Factory option l External interlock m Cold Water Start Cold Water Run optional n Ignition lock out 3 A Central Point Wiring board with diagnostic LED s indicating the status of each relay 4 Provide ignition module indicating the following flash codes by LED signal and displayed on LCD display a 1 flash low air pressure b 2 flashes flame in the combustion chamber w o CFH c 3 flash...

Page 4: ...all be configured with a modulating three way valve that is controlled by a system matched PID controller The PID controller temperature sensor shall be located in the inlet header of the boiler 3 The control shall have a temperature setting dial located on the face of the board The temperature range of the dial shall be 105ºF to 120ºF The PID Logic shall be capable of limiting system overshoot to...

Page 5: ...es laws regulations and ordinances 2 National Fuel Gas Code ANSI Z223 1 NFPA 54 latest edition 3 National Electrical Code ANSI NFPA 70 latest edition 4 Standard for Controls and Safety Devices for Automatically Fired Boilers ANSI ASME CSD 1 when required 5 Canada only CAN CSA B149 Installation Code and CSA C22 1 CEC Part I 6 Manufacturer s installation instructions including required service clear...

Reviews: