34
Your Boiler must be installed, commissioned and serviced in accordance with any instructions
and recommendations of the manufacturer from time to time in force as may be communicated
to you.
In addition:
x
The commissioning certificate in respect of your Boiler must be returned to Warmflow
within thirty (30) days from the date of installation. Please note if your Boiler has not been
installed within three (3) months of the date of dispatch from Warmflow, then this
guarantee will be deemed to have commenced upon such date of dispatch. Please also
note that failure to complete and return the commissioning certificate at the time of
installation will invalidate all guarantees.
x
Your Boiler must be installed and commissioned by an appropriately qualified person
with suitable training* and experience, with commissioning completed immediately
following installation.
x
Your Boiler must be serviced by an appropriately qualified person with suitable training*
and experience twelve (12) months after the date of installation and thereafter at twelve
(12) monthly intervals or sooner if required by the variable service schedule in the
controller. Warmflow reserves the right to determine at its absolute discretion whether a
person is appropriately qualified and has suitable training and experience.
x
Each service record must be completed with proof of servicing retained and made
available to Warmflow in respect of any claim.
x
If you choose to have someone other than an appropriately qualified person with suitable
training* and experience carry out works to your Boiler, this warranty will automatically
become null and void.
x
The pellets used in your Boiler must at all times comply with recognised industry
standards for wood pellets.(Currently ENPlus A1)
x
The ash pan of your Boiler must be emptied as requested by the control screen or at
least on a monthly basis and thoroughly cleaned in accordance with any instructions of
the manufacturer from time to time in force as may be communicated to you.
* i.e. Warmflow product training course
In the event of a breakdown please contact your commissioning engineer who should
then contact our Customer care Department whilst at your home to report the fault.
PLEASE NOTE THAT FAILURE TO REGISTER AND ANNUALLY SERVICE THIS PRODUCT
WILL INVALIDATE ALL GUARANTEES IN THEIR ENTIRETY
Exclusions of Guarantee
Содержание WS18
Страница 4: ...6 APPLIANCE INSTALLATION COMMISSIONING CERTIFICATE REGISTRATION 33 7 APPLIANCE SERVICE RECORDS 35...
Страница 18: ...18 Engineer Figure 20 Flow Chart...
Страница 27: ...27 Figure 30 Flue Assembly...
Страница 28: ...28 4 COMMISSIONING AND SERVICING Figure 31 Flue Outlet Positions for Solid Fuel Appliances...
Страница 39: ...39 INTENTIONALLY LEFT BLANK...