All wiring must be carried out in accordance with current IEE wiring regulations. It is
recommended the user interface controller is mounted in an easily accessible location within the
property. The wiring connection to the user interface is via a pLAN connection and must be
wired from the wiring panel to the user interface controller with the supplied CAT5e cable.
The following section details the connection of the appliance to the user interface controller via
the supplied 20m CAT5e cable. Figure 27 below shows the colour coding of the wiring into the
pLAN terminals. These terminals are located in the Installer's wiring panel at the front of the
appliance as shown in Figure 1 (see page 1). The other end of the cable, with the RJ12 plug
connects into the back of the user interface controller supplied.
+
⎓ 24V
pLAN
GND
+Tx
‐Tx
+
⎓
24V
pLAN (ext.)
GND
Solid Green
Striped White/Blue
Striped White/Green
Solid Blue
Striped White/Yellow
Solid Orange
All connections are made to the quickconnect type connection block. Insulation on the wires
must be stripped back by 10mm for the purposes of connection. The solid brown coloured wire
and striped white/brown coloured wire are not to be used and should be cut back to the outer
sheath of the cable.
The
mains supply to the appliance is permanent and should be fused at 13 amps. A switched
live from a time clock or programmer is required to control the appliance as shown in Figures 28
and 29 below.
NEUTRAL,
N ~
230V SINGLE PHASE
SUPPLY IN
13AMPS
EARTH,
E
⏚
SWITCHED
LIVE, L ~
PERM.
LIVE, L ~
Figure 28: Mains Supply Wiring Schematic.
Figure 27: User Interface Wiring Schematic.
Содержание WS18
Страница 4: ...6 APPLIANCE INSTALLATION COMMISSIONING CERTIFICATE REGISTRATION 33 7 APPLIANCE SERVICE RECORDS 35...
Страница 18: ...18 Engineer Figure 20 Flow Chart...
Страница 27: ...27 Figure 30 Flue Assembly...
Страница 28: ...28 4 COMMISSIONING AND SERVICING Figure 31 Flue Outlet Positions for Solid Fuel Appliances...
Страница 39: ...39 INTENTIONALLY LEFT BLANK...