38
Installation & Commissioning Certificate
Da te of Ins ta l l a ti on:
1. Installing Engineer Details.
MCS/SEAI Regi s tra ti on No.
Ins ta l l a ti on Compa ny Na me:
Ins ta l l a ti on Compa ny Addres s :
Conta ct Tel ephone No.:
(LandLine)
(Mobile)
Ins ta l l er’s Na me:
Ins ta l l er's E‐Ma i l Addres s
2.
Appliance Details.
Appl i a nce Model No.:
Output:
Appl i a nce Seri a l No.:
Da te Code:
MCS Approva l No.:
WS18:
BSI KM 608787/2
WS18:
BSI KM 608787/2
3.
Householder & Installation Address Details.
Hous ehol der’s Na me:
Hous ehol der’s Addres s :
Pos t Code:
Conta ct Tel ephone No.:
(LandLine)
(Mobile)
Hous ehol der’s E‐Ma i l Addres s :
4.
System Details
Approx. Age of Dwel l i ng:
(Yea rs )
Dwel l i ng Fl oor Area :
(m
2
)
Repl a cement Hea ti ng Sys tem?
New Hea ti ng Sys tem:
Open Vented:
Sea l ed Sys tem:
Automa ti c Bypa s s Fi tted?
Yes :
No:
Is the s ys tem for:
Spa ce Hea ti ng Onl y:
Spa ce Hea ti ng & Hot Wa ter:
Tota l Sys tem Vol ume:
(Litres)
Tota l Expa ns i on Ca pa ci ty:
(Litres)
Ha s the s ys tem been fl us hed:
Yes :
No:
Wha t Cl ea ns er Wa s Us ed?
Ha s Corros i on Inhi bi tor been
a dded?
Bra nd:
Li tres Us ed:
Tota l Equi va l ent Fl ue Length:
(Metres )
Fl ue Sta bi l i s er Fi tted?
Yes :
No:
Auxi l i a ry Hea t Sources
Yes :
No:
If Yes , pl ea s e s peci fy bel ow
Deta i l s of Auxi l i a ry Hea t Sources :
5.
Commissioning Engineer Details.
Tick here if commissioned by Installer and proceed directly to 6. Commissioning Performance.
MCS/SEAI Registration No.
Installation Company Name:
Installation Company Address:
Contact Telephone No.:
(LandLine)
(Mobile)
Installer’s Name:
Installer's EMail Address
6.
Commissioning Performance.
Commissioning Date:
Flue Gas Analyser Make & Model:
Calibration Date:
Fuel Brand:
ENplus 1:
CO
2
Concentration (%)
CO Concentration (ppm)
Flue Gas Temperature (°C)
Draught (Pa)
Fan (RPM)
Efficiency (Nett %)
7. Statement of Conformity.
Notes:
8. Commissioning Completion.
Competent Person’s Signature:
Print Name
Customer’s Signature*
Print Name
*To confirm demonstrations of the appliance and receipt of related appliance instructions.
Notes:
1. An estimate of system performance is detailed in a separate document w ithin the Installer’s Handover Pack.
2. The system requires regular maintenance, details of w hich can be found w ithin the Installer’s Handover Pack and manufacturer’s instructions.
3. A certificate confirming registration on the MCS Installation Database can be found w ithin the Installer’s Handover Pack.
Has the manufacturer’s maintenance instructions
and schedules been explained to the customer?
Does the installation comply with the Manufacturer’s
instructions?
Does the installation conform to the requirements of MCS
Microgeneration Installation Standard MIS 3004?
Has the appliance operating manual been provided to the
customer?
Has the customer manufacturer’s instructions on
the correct operation of the appliance been
explained to the customer?
Has the customer been informed of the appliance’s
fuel requirements including moisture content and
correct storage?
Has the appliance warranty documentation been
provided to the customer?
Does the installation conform to IEE Regulations, relevant
British & European standards, codes of practice, Building
Regulations and Local Authority Byelaws?
Yes
P
Yes
P
Yes
P
Содержание WS18
Страница 4: ...6 APPLIANCE INSTALLATION COMMISSIONING CERTIFICATE REGISTRATION 33 7 APPLIANCE SERVICE RECORDS 35...
Страница 18: ...18 Engineer Figure 20 Flow Chart...
Страница 27: ...27 Figure 30 Flue Assembly...
Страница 28: ...28 4 COMMISSIONING AND SERVICING Figure 31 Flue Outlet Positions for Solid Fuel Appliances...
Страница 39: ...39 INTENTIONALLY LEFT BLANK...