OPE R ATING A ND OPE R ATION
91
W L 50
Each time before starting work
Examine the loader for visible defects prior to each work
•
shift.
Check the functioning of the operating equipment.
•
Check the functioning of the brakes and warning de-
•
vices.
Report any defects to the supervisor and, when changing
•
shifts, to the operator taking your place.
Perform the checks described in sections
•
5.1 (page 58)
and 5.2.5 (page 80).
Содержание WL 50
Страница 1: ...Operator s Manual Wheel Loader WL 50 www wackerneuson com...
Страница 2: ...December 08 Edition...
Страница 46: ...TECHNICAL DATA 44 Dimensions 3 4 Dimensions Fig 11...
Страница 103: ...Operating and operation 101 WL50 Fig 46 Switch for differen tial lock 1 12V 1...
Страница 123: ...Operating and operation 121 WL50...
Страница 134: ...Towing and transporting 132 Fig 66 Tying down the loader...
Страница 169: ...SERVICING AND INSPECTION 167 WL50 Fig 72 Position of the cab mounting bolts Fig 73 Tilting the cab 1 2 3...
Страница 243: ...Appendix 241 WL50 For personal notes...
Страница 253: ...List of figures 251 WL50...